Search results
Results from the WOW.Com Content Network
Pump pressure, which is also referred to as system pressure loss, is the sum total of all the pressure losses from the oil well surface equipment, the drill pipe, the drill collar, the drill bit, and annular friction losses around the drill collar and drill pipe. It measures the system pressure loss at the start of the circulating system and ...
During circulation, the pressure applied is due to drilling mud weight and also due to the pressure applied by the mud pumps to circulate the drilling fluid. Pressure under circulating condition = Pressure under static condition + Pressure due to pumping at that point or pressure loss in the system. If we convert pressure under circulating ...
The head loss Δh (or h f) expresses the pressure loss due to friction in terms of the equivalent height of a column of the working fluid, so the pressure drop is =, where: Δh = The head loss due to pipe friction over the given length of pipe (SI units: m); [b]
In oil or gas well drilling, lost circulation [1] [2] [3] occurs when drilling fluid, known commonly as "mud", flows into one or more geological formations instead of returning up the annulus. Lost circulation can be a serious problem during the drilling of an oil well or gas well .
Casing placement is selected so that the hydrostatic pressure of the drilling fluid remains at a pressure level that is between formation pore pressures and fracture pressures. [ 6 ] [ 5 ] In order to reduce cost, a liner may be used which extends just above the shoe (bottom) of the previous casing interval and hung off downhole rather than at ...
In fluid dynamics, pipe network analysis is the analysis of the fluid flow through a hydraulics network, containing several or many interconnected branches. The aim is to determine the flow rates and pressure drops in the individual sections of the network. This is a common problem in hydraulic design.
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
For example, if the tool fails at 1,500 ft (460 m) while drilling with a triple rig (able to trip 3 joints of pipe, or about 90 ft (30 m) feet, at a time), then it would generally be faster to pull the tool out of the hole than it would be to rig up wireline and retrieve the tool, especially if the wireline unit must be transported to the rig.