Search results
Results from the WOW.Com Content Network
Miami-Dade County was the first in Florida to certify hurricane-resistant standards for structures which the Florida Building Code subsequently enacted across all requirements for hurricane-resistant buildings. Many other states reference the requirements set in the Florida Building codes, or have developed their own requirements for hurricanes ...
A French drain, PVC pipe, or other drainage system is installed in the newly made channel. The installed drain is covered with new cement. The drainage system collects any water entering the basement and drains it to an internally placed sump pump system, which will then pump the water out of the basement. The Federal Emergency Management ...
The International Code Council (ICC), also known as the Code Council, is an American nonprofit standards organization sponsored by the building trades, which was founded in 1994 through the merger of three regional model code organizations in the American construction industry. [1]
A slab-on-grade or basement floor should be poured over a cross-laminated polyethylene vapor barrier over 4 inches (10 cm) of granular fill to prevent wicking of moisture from the ground and radon gas incursion. Inside a steel building, water vapor will condense whenever it comes into contact with a surface that is below the dew point temperature.
Floor drain system in bathroom, Korea. A floor drain is a plumbing fixture that is installed in the floor of a structure, mainly designed to remove any standing water near it. They are usually round, but can also be square or rectangular. They usually range from 2 to 12 inches (5.1 to 30.5 cm); most are 4 inches (10 cm) in diameter.
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Trap with copper drain pipe at underside of firestop packing in two-hour fire-resistance rated concrete floor slab Typical P-trap. Maintaining the water seal is critical to trap operation; traps might dry out, and poor venting can suction or blow water out of the traps. This is usually avoided by venting the drain pipes downstream of the trap ...
A building code (also building control or building regulations) is a set of rules that specify the standards for construction objects such as buildings and non-building structures. Buildings must conform to the code to obtain planning permission , usually from a local council.