Search results
Results from the WOW.Com Content Network
Square rig is a generic type of sail and rigging arrangement in which the primary driving sails are carried on horizontal spars which are perpendicular, or square, to the keel of the vessel and to the masts. These spars are called yards and their tips, outside the lifts, are called the yardarms. [1] A ship mainly rigged so is called a square ...
Rigging is both a noun, the equipment, and verb, the action of designing and installing the equipment, in the preparation to move objects. A team of riggers design and install the lifting or rolling equipment needed to raise, roll, slide or lift objects such as heavy machinery, structural components, building materials, or large-scale fixtures ...
Rigging comprises the system of ropes, cables and chains, which support and control a sailing ship or sail boat's masts and sails. Standing rigging is the fixed rigging that supports masts including shrouds and stays. Running rigging is rigging which adjusts the position of the vessel's sails and spars including halyards, braces, sheets and ...
The rigging arrangements can influence the applied anchor load, where statically indeterminate systems are not necessarily a design consideration, but can be used in practice. The determination of the loads through the rigging system must be a consideration whilst calculating the load resistant model, refer to the examples shown in Figure 3.
Standing rigging comprises the fixed lines, wires, or rods, which support each mast or bowsprit on a sailing vessel and reinforce those spars against wind loads transferred from the sails. This term is used in contrast to running rigging, which represents the moveable elements of rigging which adjust the position and shape of the sails. [1]
Continuous-track crawler systems moved Link-Belt products off the railroad chassis, removing the need for temporary tracks. Dragline excavators expanded the power of crane-shovel systems. By 1922, Link-Belt expanded into this crawler-mounted crane-shovel excavator market, complementing its locomotive cranes and material handling equipment.
The case involved the bid system for Aldi construction projects in southern Illinois and Missouri.
In 1949 he started his own company, DeLong Engineering & Construction Company. In 1950 he constructed the DeLong Rig No. 1 for Magnolia Petroleum, consisting of a barge with six legs. In 1953 DeLong entered into a joint venture with McDermott, which built the DeLong-McDermott No.1 in 1954 for Humble Oil. This was the first mobile offshore ...