Casing that is cemented in place aids the drilling process in several ways: [2] Prevents contamination of fresh water well zones. Prevents unstable upper formations from caving in and sticking the drill string or forming large caverns. Provides a strong upper foundation to allow use of high-density drilling fluid to continue drilling deeper.
The well designer has many tools and options available to design the lower completion (downhole completion) according to the conditions of the reservoir. Typically, the lower completion is set across the productive zone using a liner hanger system, which anchors the lower completion to the production casing string.
It is the height of the free surface of water above a given point beneath the surface. [4] Pumping level is the level of water in the well during pumping. [8] Specific capacity is the well yield per unit of drawdown. [8] Static level is the level of water in the well when no water is being removed from the well by pumping. [8]
A liner is a casing string that does not extend to the surface, being hung instead from a liner hanger set inside of the previous casing string but usually within about 300 feet (91 m) of its bottom. Other than the obvious cost savings, the liner installation allows larger drill pipe or production tubing to be used in the upper portions of the ...
The planning phases involved in drilling an oil or gas well typically involve estimating the value of sought reserves, estimating the costs to access reserves, acquiring property by a mineral lease, a geological survey, a well bore plan, and a layout of the type of equipment required to reach the depth of the well. Drilling engineers are in ...
Well engineering consists of engineering facilitating the design and construction of a well. It is based on pore pressure , kick tolerance, casing functions, casing design and cementing. It is sometimes related to drilling and petroleum engineering .
For example, if the tool fails at 1,500 ft (460 m) while drilling with a triple rig (able to trip 3 joints of pipe, or about 90 ft (30 m) feet, at a time), then it would generally be faster to pull the tool out of the hole than it would be to rig up wireline and retrieve the tool, especially if the wireline unit must be transported to the rig.
To determine the fracture gradient around the casing shoe and therefore establish the upper limit of the primary well control for the open hole section below the current casing. To investigate well bore capability to withstand pressure below the casing shoe in order to test the well engineering plan regarding the casing shoe setting depth.