enow.com Web Search

  1. Ads

    related to: 24 inch pier footing form for concrete patio pictures and sizes

Search results

  1. Results from the WOW.Com Content Network
  2. Franki piling system - Wikipedia

    en.wikipedia.org/wiki/Franki_Piling_System

    Franki piles can be used as high-capacity deep foundation elements without the necessity of excavation or dewatering. [4] They are useful in conditions where a sufficient bearing soil can only be reached deeper in the ground, [5] [6] and are best suited to granular soil where bearing is primarily achieved from the densification of the soil around the base. [4]

  3. Caisson (engineering) - Wikipedia

    en.wikipedia.org/wiki/Caisson_(engineering)

    Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.

  4. Grade beam - Wikipedia

    en.wikipedia.org/wiki/Grade_beam

    A grade beam or grade beam footing is a component of a building's foundation. It consists of a reinforced concrete beam that transmits the load from a bearing wall into spaced foundations such as pile caps or caissons. [1] It is used in conditions where the surface soil's load-bearing capacity is less than the anticipated design loads.

  5. Piling - Wikipedia

    en.wikipedia.org/wiki/Deep_foundation

    In drilled pier foundations, the piers can be connected with grade beams on which the structure sits, sometimes with heavy column loads bearing directly on the piers. In some residential construction, the piers are extended above the ground level, and wood beams bearing on the piers are used to support the structure.

  6. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...

  7. Waffle slab foundation - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab_foundation

    Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.

  8. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  1. Ads

    related to: 24 inch pier footing form for concrete patio pictures and sizes