Proposals to modernise the sewerage system had been made in the early 1700s but the costs of such a project deterred progress. Further proposals followed in 1856, but were again neglected due to the costs. However, after the Great Stink of 1858, Parliament realised the urgency of the problem and resolved to create a modern sewerage system. [2]
Everyone has the right to be connect to a water supply and to sewers, but the cost of new connections is borne by the customer. [35] UK water quality is generally high, since large new investments were made following the EU Drinking Water Quality Directive 1998, requiring water is "wholesome and clean". [36]
The decision to build a combined sewer system or two separate systems is mainly based on the need for sewage treatment and the cost of providing treatment during heavy rain events. Many cities with combined sewer systems built their systems prior to installing sewage treatment plants, and have not subsequently replaced those sewer systems. [2]
The costs of treating the sewage at Beckton was £73,698 or £1 4s 11d per million gallons (£1.246 per 4546.1 m 3) in 1912/13; by 1919/20 the cost had increased to £79,074 or £1 6s 6d. (£1.325) per million gallons. [3] [2]
The estimated cost of the project has escalated, from £1.7bn in 2004 (including Stratford to East Ham part and sewage treatment civil engineering construction movements (STW) costs) to £2.2bn in 2007 (also including Lee Tunnel and STW costs) to £3.6bn now for the shorter Thames Tunnel as far as Abbey Mills, plus some £1bn for the Lee Tunnel ...
Whilst independent assessments place the cost of water provision in Wales and England as higher than most major countries in the EU between 1989 and 2005, the government body responsible for water regulation, together with the water companies, have claimed improvements in service quality during that period.
Map of Seattle sewer districts, 1894. The main part of such a system is made up of large pipes (i.e. the sewers, or "sanitary sewers") that convey the sewage from the point of production to the point of treatment or discharge. Sewers under construction in Ystad, Sweden. Types of sanitary sewer systems that all usually are gravity sewers include:
The plant was built in 1931–36 for £1.7 million by Middlesex County Council, replacing 28 small sewage treatment facilities as part of the West Middlesex (Mogden-Perry Oaks) Main Drainage Scheme, [3] [4] which had a total estimated cost of £5.25 million (equivalent to £381,000,000 in 2023). [5]