Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.
Cut-and-cover construction at Saint-Michel on Paris Métro Line 4 (c. 1910) Cut-and-cover is a simple method of construction for shallow tunnels where a trench is excavated and roofed over with an overhead support system strong enough to carry the load of what is to be built above the tunnel. [29] There are two basic forms of cut-and-cover ...
Deep level underground is construction that is 20 m (66 ft) or more below ground and not using the cut-and-cover method, especially train stations, air raid shelters and bunkers, and some tunnels and mines. Cut-and-cover is a simple method of construction for shallow tunnels where a trench is excavated and roofed over with an overhead support ...
Underground construction has a number of unique risks and challenges but shares a lot with traditional construction and mining. Underground construction workers often work under reduced light condition, in dangerous spaces, and are at a high risk of exposure to contaminants, fire, and explosions.
Most sections of the Regional Connector tunnel is built using the tunnel boring machine (TBM) construction method, [25] though some sections (especially the locations of the three subway rail stations) use the cut-and-cover construction method [25] with an emphasis on maintaining as much road access as possible during construction.
Image credits: Getty Images/Unsplash (Not the actual photo) The proposed idea was initially touted to cost a staggering $25 trillion, but no company has officially announced a plan for such a tunnel.
The tunnel is actually twin parallel tunnels built by the cut-and-cover method, with the tunnels under waterways built bottom-up behind temporary cofferdam walls. [2] The western portal of the tunnel is at the eastern end of The Highway (A1203), just east of its junction with Butcher Row.
There are 20 miles (32 km) of cut-and-cover tunnel and 93 miles (150 km) of tube tunnel, the other 55% of the system running above ground. [1] Trains generally run on the left-hand track, although in some places, for example the Central line east of St Paul's station, tunnels are dug one above each other. [6]