The mostly used turbines are Pelton and Cross-flow types. Most of the MHP turbines are manufactured locally. The first turbine manufactured at the Balaju Yantra Shala Pvt. Ltd. (established 1960) was a 5 kW propeller turbine for the first MHP of Nepal in 1962. Kathmandu Metal Industries Pvt. Ltd., Nepal YantraShala Energy, Nepal Hydro & Electric Pvt. Ltd., Nepal Machine and Steel Structure, a
Pharping Hydro Power Project (Nepali: फर्पिङ लघु जलविद्युत् परियोजना) is the first hydro-power project of Nepal and second of South Asia. It is situated in Kathmandu district. [1] In 2010, it was declared a Living Museum by government of Nepal and was open for public. [2]
Sundarijal Small Hydropower Station (Nepali: सुन्दरिजल सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Kathmandu District of Nepal. The flow from Sundarijal River is used to generate 640 kW electricity and annual energy generation is 4.77 GWh.
Mai Khola Small Hydropower Station (Nepali: माई खोला सानो जलविद्युत आयोजना) is a run-of-the-river hydro-electric plant located in Ilam District of Nepal. The flow from Mai River is used to generate 8 MW electricity.
Padam Khola Small Hydropower Station (Nepali: पदम खोला सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Dailekh District of Nepal. The flow from Padam River is used to generate 4.8 MW electricity. The design flow is 2.27 m 3 /s and design head is 243.4 m. [1]
The electrification rate in Nepal has notably improved in recent years, with access rising from 93% in 2020/21 to 94 % in 2021/22. The government aims to achieve 100% electricity access nationwide by 2024. [14] In the wet season, Nepal exports its surplus hydroelectricity to India through Indian Energy Exchange. As of 8 June 2022, four of Nepal ...
This is only project in Nepal to utilize pressurized Glass Fibre reinforced Plastic (GRP) pipe for flow conduction. The plant has two units with Turgo turbine (2 *1250 KW). The power is evacuated via 33kVA transmission line to switch-yard of Sunkoshi Hydropower Station (9MW) The plant was completely submerged by 2014 Sunkoshi blockage. [3]
Radhi Small Hydropower Station (Nepali: राधी सानो जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Lamjung District of Nepal. The flow from Radhi River is used to generate 4.4 MW electricity. The design flow is 0.874 m3/s and head is 617 m. [1]