The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
The second unit of the 2×195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station has an installed capacity of 610 MW. Another 500 MW extension has been planned. East Central Railway will provide uninterrupted supply of coal to the thermal power station. [7]
Later in 2002, its installed capacity crossed 20,000 MW. [10] NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share. [13] On the day of listing, it became the third largest company in India in terms of market capitalisation. [14]
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...
Talcher Super Thermal Power Station or NTPC Talcher Kaniha located in Angul district of the Indian state of Odisha is the first mega power plant of India to have an installed generation capacity of 3000MW. The power plant is one of the coal-based power plants of NTPC.
Stage Unit Number Installed Capacity (Date of Commissioning First: 1: 200: January, 1986 First: 2: 200: December, 1986 First: 3: 200: August, 1987 Second: 4: 500 ...
NTPC Rihand is situated 75 km away from Renukoot railway station. By personal cab or public transport bus, one can reach Rihand Nagar. Local market outside NTPC township is Bijpur. If one is interested in a bit bigger market, one has to go to Waidhan which is 30 km away from Rihandnagar.
The plant has six induced draft cooling towers (IDCTs), which have a capacity of 30,000 cubic metres per hour (1,100,000 cu ft/h) with nine cells of 14 by 21 metres (46 ft × 69 ft) each. [4] The IDCTs use seawater, which is drawn from the intake channel of North Chennai Thermal Power Station , and fresh water requirement is met from a ...