Ad
related to: vapor barrier needed or not covered by fire definition form
Search results
Results from the WOW.Com Content Network
A vapor barrier on the warm side of the envelope must be combined with a venting path on the cold side of the insulation. This is because no vapor barrier is perfect, and because water may get into the structure, typically from rain. In general, the better the vapor barrier and the drier the conditions, the less venting is required. [7]
Open-cell foam is porous, allowing water vapor and liquid water to penetrate the insulation. Closed-cell foam is non-porous, and not moisture-penetrable, thereby effectively forming a semi-permeable vapor barrier. (N.B., vapor barriers are usually required by the Building Codes, regardless of the type of insulation used.
In order to achieve these objectives, all building enclosure systems must include a solid structure, a drainage plane, an air barrier, a thermal barrier, and may include a vapor barrier. Moisture control (e.g. damp proofing) is essential in all climates, but cold climates and hot-humid climates are especially demanding. [8]
In March, 2008, the city of Portland, Oregon, granted a waiver of the requirement for a vapor barrier or retarder when using cellulose insulation. [11] This appeal cited industry guidance that the combination of an exterior vapor retarder (as required by code) and an interior one could trap moisture in the wall, leading to damage.
It is important to realise a single R-value or U-value does not take into account the quality of construction or local environmental factors for each building. Construction quality issues can include inadequate vapor barriers and problems with draft-proofing. In addition, the properties and density of the insulation material itself are critical.
Also of note is that when needed for special circumstances longer spans can often be requested, such as for a long roof span. Typical U.S. height for panels is 8 or 9 feet (2.4 or 2.7 m). Panels come in widths ranging from 4 to 12 inches (100–300 mm) thick and a rough cost is $4–$6/ft 2 in the U.S. [ 5 ] In 4Q 2010, new methods of forming ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Concrete normally allows moisture to pass through so a vertical vapor barrier is needed. Barriers may be a coating or membrane applied to the exterior of the concrete. The coating may be asphalt, asphalt emulsion, a thinned asphalt called cutback asphalt, or an elastomer. [9] Membranes are rubberized asphalt or EPDM rubber. Rubberized products ...
Ad
related to: vapor barrier needed or not covered by fire definition form