    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    The height of the ribs and beams should be 1 ⁄ 25 of the span between columns. [3] The width of the solid area around the column should be 1 ⁄ 8 of the span between columns. Its height should be the same as the ribs. [3] Diagram showing waffle slab rib and Beam Heights rule of thumb formulas.

  4. Large panel system building - Wikipedia

    en.wikipedia.org/wiki/Large_panel_system_building

    The first German use of large panel system-building construction is what is now known as the Splanemann-Siedlung in Berlin's Lichtenberg district, constructed in 1926–1930. [1] These two- and three-storey apartment houses were assembled of locally cast slabs, inspired by the Dutch Betondorp in Watergraafsmeer , a suburb of Amsterdam .

  5. Precast concrete - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete

    The overall thickness of sandwich wall panels in commercial applications is typically 8 inches, but their designs are often customized to the application. In a typical 8-inch wall panel the concrete wythes are each 2-3/8 inches thick), sandwiching 3-1/4 inches of high R-value insulating foam. The interior and exterior wythes of concrete are ...

  6. Precast concrete lifting anchor system - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete_lifting...

    No panel rotation is being considered. Panel Volume: V = w x h x d = 6.0 m x 3.0 m x 0.15 m = 2.7 m 3; Weight: W = V x concrete specific gravity = 2.7 m 3 x 24 kN/m 3 = 64.8 kN; Calculated casting bed suction Suction area: A = w x h = 6.0 m x 3.0 m = 18 m 2; Assuming 1.0 kN/m 2 is applied for oiled steel formwork

  7. Tilt up - Wikipedia

    en.wikipedia.org/wiki/Tilt_up

    A finished tilt-up building. Tilt-up, tilt-slab or tilt-wall is a type of building and a construction technique using concrete.Though it is a cost-effective technique with a shorter completion time, [1] poor performance in earthquakes has mandated significant seismic retrofit requirements in older buildings.

  8. Panel building - Wikipedia

    en.wikipedia.org/wiki/Panel_building

    Panel buildings may refer to buildings of one of the following types: Built of structural insulated panels; Built of pre-fabricated concrete blocks, named differently in various countries. Large Panel System building known as Plattenbau in German, Panelák in Czech and Slovak, wielka pÅ‚yta in Polish and Panelház in Hungarian.

  9. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).