Search results
Results from the WOW.Com Content Network
The CJ-Series Joists are capable of supporting larger floor or roof loadings due to the attachment of the concrete slab to the top chord of the composite joist. Shear connection between the concrete slab and steel joist is typically made by the welding of shear studs through the steel deck to the underlying CJ-Series Composite Steel Joist. [2]
The width of the ribs is typically 130 mm (5 in) to 150 mm (6 in), and ribs usually have steel rod reinforcements. [5] The distance between ribs is typically 915 mm (3 ft). [3] The height of the ribs and beams should be 1 ⁄ 25 of the span between columns. [3] The width of the solid area around the column should be 1 ⁄ 8 of
The outermost joist in half timber construction may be of a more durable species than the interior joists. In a barn, loose poles above the drive floor are called a scaffold . Between the joists, the area called a joist-bay, and above the ceiling in some old houses is material called pugging , which was used to deaden sound, insulate, and ...
In light-frame construction, a trimmer is a timber or metal beam (joist) used to create an opening around a stairwell, skylight, chimney, and the like. Trimmers are installed parallel to the primary floor or ceiling joists and support headers , which run perpendicular to the primary joists.
The underlying unit of size given in ISO 2848 for modular coordination is the 'basic module'. [1] The 'basic module' is represented in the standards by the letter M, and has two standard definitions. It is primarily defined as 100 mm (3.937 inches), with the proviso that in countries using imperial units it is defined as 4 inches (101.6 mm).
In dimensioned lumber construction, the rim joists are the same depth, thickness and material as the joists themselves; in engineered wood construction, the rim joists may be oriented strand board (OSB), plywood or an engineered wood material varying in thickness from 1 inch (25 mm) to as much as 1 + 3 ⁄ 4 inches (44 mm), though they are ...
The rim joist depth must match the I-joist size. Mismatches can strain the joist. A similar situation occurs where the I-joist crosses a main beam. Installing squash blocks (2×4 materials 1 ⁄ 16 in or 1.6 mm higher than the I-joist) alongside the I-joists transfers the load from the I-joist onto the beam. Missed nails and glue setting too ...
Additionally, some manufacturers further cut LVL into sizes for use as chord-members on I-joists. In 2012, North American LVL manufacturers produced more than 1.2 million cubic metres (43.4 million cubic feet) of LVL in 18 different facilities, and in 2013 the production increased by more than 14%.