Search results
Results from the WOW.Com Content Network
A smart ventilation system adjusts ventilation rates in time or by location in a building to be responsive to one or more of the following: occupancy, outdoor thermal and air quality conditions, electricity grid needs, direct sensing of contaminants, operation of other air moving and air cleaning systems. In addition, smart ventilation systems ...
Vertical section through a commercial building using HVAC plenum instead of airspace plenum. When both the supply and return ducts are constructed in this manner, it is possible to insulate the ducts and the dropped ceiling so that the upper airspace is not heated or cooled, increasing energy efficiency. This is a fully enclosed plenum.
[4] [5] In contrast, returns (grilled ducts which suck air back into the HVAC system for heating or cooling) are usually placed in the wall or ceiling nearest the center of the building. Generally, in rooms where it is critical to maintain a constant temperature two registers (one placed near the ceiling to deliver cold air, and one placed in ...
Displacement ventilation is best suited for taller spaces (higher than 3 meters [10 feet]). [2] Standard mixing ventilation may be better suited for smaller spaces where air quality is not as great a concern, such as single-occupant offices, and where the room height is not tall (e.g., lower than 2.3 meters [7.5 feet]).
The majority of guidance available for design of heat and smoke building vents installed in buildings is restricted to nonsprinklered, single-story buildings. [4] This is partly a historical consequence of the installation of heat and smoke vents following the August 1953 General Motors, Livonia, MI major fire in a nonsprinklered manufacturing facility which effectively stopped the production ...
Get breaking Finance news and the latest business articles from AOL. From stock market news to jobs and real estate, it can all be found here.
The high point of the vent system (the top of its "soil stack") must be open to the exterior at atmospheric pressure. On large systems, separate parallel vent stacks may also be run to ensure sufficient airflow, because the number of devices linked to an atmospheric vent, and their distances from it, are regulated by plumbing code.
A slab-on-grade or basement floor should be poured over a cross-laminated polyethylene vapor barrier over 4 inches (10 cm) of granular fill to prevent wicking of moisture from the ground and radon gas incursion. Inside a steel building, water vapor will condense whenever it comes into contact with a surface that is below the dew point temperature.