Search results
Results from the WOW.Com Content Network
Nameplate capacity, also known as the rated capacity, nominal capacity, installed capacity, maximum effect or gross capacity, [1] is the intended full-load sustained output of a facility such as a power station, [2] [3] electric generator, a chemical plant, [4] fuel plant, mine, [5] metal refinery, [6] and many others.
The proposed 20,000 MW Australia's Darwin Solar Park, for the Australia-Asia Power Link, would be slightly below the capacity of the Three Gorges Dam. [ 3 ] [ 4 ] The proposed Grand Inga Dam in the Democratic Republic of the Congo would surpass all existing power stations, including the Three Gorges Dam, if construction commences as planned.
As an example, consider the use of a 10 hp, 1760 r/min, 440 V, three-phase induction motor (a.k.a. induction electrical machine in an asynchronous generator regime) as asynchronous generator. The full-load current of the motor is 10 A and the full-load power factor is 0.8. Required capacitance per phase if capacitors are connected in delta:
If you’re stuck on today’s Wordle answer, we’re here to help—but beware of spoilers for Wordle 1331 ahead. Let's start with a few hints.
The 20V149 TIB DDEC III SCCC in stand-by generator spec has an output of 2,936 hp (2,189 kW) from a capacity of 2,980 cu in (48.8 L). All Series 149 engines have overhead camshafts and the cylinder heads fit into the engine block; this is referred to as the "pothead" design. The blowers are also recessed into the block; this section of the ...
Grids with high penetration of renewable energy sources generally need dispatchable generation rather than baseload generation. Dispatchable generation refers to sources of electricity that can be programmed on demand at the request of power grid operators, according to market needs.
An electrical grid may have many types of generators and loads; generators must be controlled to maintain stable operation of the system. In an electric power system, automatic generation control (AGC) is a system for adjusting the power output of multiple generators at different power plants, in response to changes in the load.
As an example, a 250 kVA motor–generator operating at 300 ampere of full load current will require 1550 ampere of in-rush current during a re-closure after 5 seconds. This example used a fixed mounted flywheel sized to result in a 1 ⁄ 2 Hz per second slew rate. The motor–generator was a vertical type two-bearing machine with oil-bath ...