Search results
Results from the WOW.Com Content Network
Sample Ishikawa diagram shows the causes contributing to problem. The defect, or the problem to be solved, [1] is shown as the fish's head, facing to the right, with the causes extending to the left as fishbones; the ribs branch off the backbone for major causes, with sub-branches for root-causes, to as many levels as required.
Structural integrity and failure is an aspect of engineering that deals with the ability of a structure to support a designed structural load (weight, force, etc.) without breaking and includes the study of past structural failures in order to prevent failures in future designs.
A fault tree diagram. Fault tree analysis (FTA) is a type of failure analysis in which an undesired state of a system is examined. This analysis method is mainly used in safety engineering and reliability engineering to understand how systems can fail, to identify the best ways to reduce risk and to determine (or get a feeling for) event rates of a safety accident or a particular system level ...
A PFMEA will focus on process failure modes (such as inserting the wrong drill bit). Failure cause and/or mechanism Defects in requirements, design, process, quality control, handling or part application, which are the underlying cause or sequence of causes that initiate a process (mechanism) that leads to a failure mode over a certain time.
Under the functional failure mode approach, the actual functional failure modes of the product are identified during a DFMEA. During the detailed FMEDA, each component failure mode is mapped to a functional failure mode. The functional failure modes are then categorized according to product failure mode in a particular application. [13]
The average rate of cosmic-ray soft errors is inversely proportional to sunspot activity. That is, the average number of cosmic-ray soft errors decreases during the active portion of the sunspot cycle and increases during the quiet portion. This counter-intuitive result occurs for two reasons.
Citicorp accepted LeMessurier's proposal to weld steel plates over the bolted joints, and Karl Koch Erecting was hired for the welding process. [31] Very few people were made aware of the issue, besides Citicorp leadership, mayor Ed Koch, acting buildings commissioner Irving E. Minkin, and the head of the welder's union. [20] [31]
To make a PLC fail-safe the system does not require energization to stop the drives associated. For example, usually, an emergency stop is a normally closed contact. In the event of a power failure this would remove the power directly from the coil and also the PLC input. Hence, a fail-safe system.