Search results
Results from the WOW.Com Content Network
Without a heat sink at an ambient temperature at 50 °C, a maximum power dissipation of (T J-T A)/R θJA = ((125-50)/80) = 0.98 W can be permitted.. In a constant voltage mode with an input voltage source at V IN at 34 V and a desired output voltage of 5 V, the maximum output current will be P MAX / (V IN-V O) = 0.98 / (34-5) = 32 mA.
LM317: Adjustable 1.5 A positive voltage regulator (1.25 V-37 V) [62] LM120 LM320 Fixed 1.5 A negative voltage regulator (-5 V, -12 V, -15 V) [63] LM123 LM323 Fixed 3 A, 5-volt positive voltage regulator [64] LM325 Yes Dual ±15-volt voltage regulator [65] LM330 5-volt positive voltage regulator, 0.6 V input-output difference [66] LM333 Yes
LM317; Metadata. This file contains additional information, probably added from the digital camera or scanner used to create or digitize it.
Front page of a floppy disk controller data sheet (1979) A datasheet, data sheet, or spec sheet is a document that summarizes the performance and other characteristics of a product, machine, component (e.g., an electronic component), material, subsystem (e.g., a power supply), or software in sufficient detail that allows a buyer to understand what the product is and a design engineer to ...
You are free: to share – to copy, distribute and transmit the work; to remix – to adapt the work; Under the following conditions: attribution – You must give appropriate credit, provide a link to the license, and indicate if changes were made.
An ICD is the umbrella document over the system interfaces; examples of what these interface specifications should describe include: The inputs and outputs of a single system, documented in individual SIRS (Software Interface Requirements Specifications) and HIRS (Hardware Interface Requirements Specifications) documents, would fall under "The Wikipedia Interface Control Document".
An integrated circuit voltage regulator. A voltage regulator is a system designed to automatically maintain a constant voltage.It may use a simple feed-forward design or may include negative feedback.
The requirements are then analyzed by a (potential) maker/supplier from a more technical point of view, broken down and detailed in a Functional Specification (sometimes also called Technical Requirements Document). The form of the PRD will vary from project to project and depends, for example, on the approach to project implementation.