Search results
Results from the WOW.Com Content Network
Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.
In addition to resource abundance, deep-sea mining benefits from high-grade deposits and lower operational costs compared to terrestrial mining due to reduced overburden removal. Optimizations such as reduced trench depth can cut mining time by 26% and increase deposit value by 53%. [138]
Excavation may be classified by type of material: [1]: 13.1 Topsoil excavation; Earth excavation; Rock excavation; Muck excavation – this usually contains excess water and unsuitable soil; Unclassified excavation – this is any combination of material types; Excavation may be classified by the purpose: [1]: 13.1, 13.2
Tunneling speeds increase over time. The first TBM peaked at 4 meters per week. This increased to 16 meters per week four decades later. By the end of the 19th century, speeds had reached over 30 meters per week. 21st century rock TBMs can excavate over 700 meters per week, while soil tunneling machines can exceed 200 meters per week.
In trench warfare, soldiers occupy trenches to protect them against weapons fire and artillery. Trenches are dug using manual tools such as shovel and pickaxe or heavy equipment such as backhoe, trencher, and excavator. For deep trenches, the instability of steep earthen walls requires engineering and safety techniques such as shoring.
Over time a 525 m (0.326 mi) section of the deep cutting has been converted back into tunnel due to sections having buildings built over. Box Tunnel in England, which opened in 1841, was the longest railway tunnel in the world at the time of construction. It was dug by hand, and has a length of 2.9 km (1.8 mi).
It is typical for progress (the "sinking rate") in the sinking phase (that is excavation, ground support and lining) of a shaft project to follow a learning curve as the project team repeats the same series of activities over and over in what is called "the sinking cycle", eventually approaching the theoretical maximum rate for that sinking set ...
Created as part of the Newtown and Machynlleth Railway, with a depth of 120 feet (37 m), it was the deepest cutting in the world at the time of its opening in the early 1860s. The original nearly-vertical sides have since been trimmed back.