enow.com Web Search

  1. Ad

    related to: plastic sheds uk clearance code for free standing stairs up hill and water

Search results

  1. Results from the WOW.Com Content Network
  2. Building regulations in the United Kingdom - Wikipedia

    en.wikipedia.org/wiki/Building_regulations_in...

    The detailed requirements of the Building Regulations in England and Wales are scheduled within 18 separate headings, each designated by a letter (Part A to Part S), and covering aspects such as workmanship, adequate materials, structure, waterproofing and weatherisation, fire safety and means of escape, sound isolation, ventilation, safe (potable) water, protection from falling, drainage ...

  3. List of British Railways shed codes - Wikipedia

    en.wikipedia.org/wiki/List_of_British_Railways...

    Sub-shed Keighley Code 23A 26 June 1950 to 7 October 1951, became 24G 20G 1950–1957 Hellifield: Code 23B 26 June 1950 to 7 October 1951, became 24H 20H 1950–1950 Lancaster (Green Ayre) Became 23C 21 Saltley (until 9 September 1963) 21A 1950–1963 Saltley (Birmingham) Sub-sheds Camp Hill, Kingsbury, Water Orton, Stratford-upon-Avon (1953 ...

  4. List of British Rail TOPS depot codes - Wikipedia

    en.wikipedia.org/wiki/List_of_British_Rail_TOPS...

    From the introduction of TOPS in 1973, all British Rail diesel and electric locomotives and multiple units were allocated to a particular traction maintenance depot or TMD. . Drawing from the terminology of steam traction, these depots were generally referred to as "sheds", and indeed most locations were those which had possessed depots for steam loc

  5. Clearance (civil engineering) - Wikipedia

    en.wikipedia.org/wiki/Clearance_(civil_engineering)

    In civil engineering, clearance refers to the difference between the loading gauge and the structure gauge in the case of railroad cars or trams, or the difference between the size of any vehicle and the width/height of doors, the width/height of an overpass or the diameter of a tunnel as well as the air draft under a bridge, the width of a lock or diameter of a tunnel in the case of watercraft.

  6. Structure gauge - Wikipedia

    en.wikipedia.org/wiki/Structure_gauge

    The code also defines the clearance that is shorter than the physical clearance to account for sag curves, bridge deflection and expected settlements with a recommendation of minimum clearance of 5 metres (16 ft 5 in). [2] In UK, the "standard minimum clearance" for structures over public highways is 16 feet 6 inches (5.03 m). [3]

  7. Shed - Wikipedia

    en.wikipedia.org/wiki/Shed

    Lifetime brand blow-moulded plastic sheds. Plastic shed kits utilising heavy moulded plastics such as PVC and polyethylene may be less expensive than sheet-metal sheds. PVC resins and high-impact, UV light-resistant polyethylene make plastic outdoor sheds stronger, lighter, more durable, and more resistant to denting and chipping than wood, and ...

  8. Handrail - Wikipedia

    en.wikipedia.org/wiki/Handrail

    Codes also generally require that there be a 1 + 1 ⁄ 2 inches (38 mm) clearance between the underside of the handrail and any obstruction—including the horizontal bracket arm. There is an allowance however for variations in the handrail size—for every 1 ⁄ 2 inch (13 mm) of additional perimeter dimension over 4 inches (102 mm), 1 ⁄ 8 ...

  9. Train shed - Wikipedia

    en.wikipedia.org/wiki/Train_shed

    A train shed is a building adjacent to a station building where the tracks and platforms of a railway station are covered by a roof. It is also known as an overall roof . Its primary purpose is to store and protect from the elements train cars not in use, The first train shed was built in 1830 at Liverpool 's Crown Street Station .

  1. Ad

    related to: plastic sheds uk clearance code for free standing stairs up hill and water
  1. Related searches plastic sheds uk clearance code for free standing stairs up hill and water

    england railway shed codesinverness district shed codes
    southern railway shed codeslms shed codes