For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
The illustrations are of modern pipe-column falsework, used to support the formwork for a post-tensioned reinforced concrete flyover connector for the eastern span replacement of the San Francisco-Oakland Bay Bridge. When the supports are complete, wood beams and plywood or reusable metal forms will be placed, reinforcing and tenon conduits ...
This can result in a different section from the classic disk or specific surfaces. This is called architectural concrete. Some structures have pile forms different from these two classic forms of column or wall. The deck of the Europe Bridge in Orléans is supported by particularly original tripodal piers.
A deck is also the surface used to construct a boardwalk over sand on barrier islands. Laying deck or throwing deck refers to the act of placing and bolting down cold-formed steel beneath roofing and concrete floors. This is usually done by an ironworker, sometimes in conjunction with a cement mason or carpenter. It regarded as one of the most ...
A self-anchored suspension bridge is a suspension bridge type in which the main cables attach to the ends of the deck, rather than directly to the ground or via large anchorages. [1] The design is well-suited for construction atop elevated piers, or in areas of unstable soils where anchorages would be difficult to construct.
A grid deck uses beams and diaphragms as the supporting structure. The supporting system of a grid deck is analyzed using a grillage analysis. A slab deck is one where the deck is analyzed as a plate. If the slab has a stiffness that is different in two directions (at right angles), then the deck is known and analyzed as an orthotropic deck.
The box girder normally comprises prestressed concrete, structural steel, or a composite of steel and reinforced concrete. The box is typically rectangular or trapezoidal in cross-section. Box girder bridges are commonly used for highway flyovers and for modern elevated structures of light rail transport.
The deck is the roadway or walkway surface. In roadway applications it is usually a poured reinforced concrete slab, but can also be a steel grid or wood plank. The deck includes any road lanes, medians, sidewalks, parapets or railings, and miscellaneous items like drainage and lighting.