The project was originally proposed in 1999 but got delayed because Coal India Limited objected to the location of the power plant and wanted NTPC to relocate the power plant as it was coming up on site having 6 billion tonnes of coal underneath it. Coal India Limited withdrew the coal linkage to the plant in 2008.
Jharkhand has 1844.00 km of national highways, 1886.40 km of state highways, 4828.10 km of major district roads and 166.00 km of other roads, totalling 8724.50 km of roads in the state. [ 1 ] Expressways
Patratu, Ramgarh district, Jharkhand: Coordinates: Status: under-construction: Construction began: May 2018: Owner: NTPC: Thermal power station ; Primary fuel: Coal: Power generation; Units operational: 3 X 800 MW (Stage 1) under construction 2 X 800 MW (Stage 2) planned: Make and model: BHEL: Nameplate capacity
NTPC Limited is constructing the 3 X 660 MW North Karanpura Thermal Power Station at Tandwa at an appraised current (2015) estimated cost of ₹ 14,366.58 crore (143,665,800,000). [7] Efforts are on to get the first unit of the North Karanpura Thermal Power Station ready in 2021.
As of April 2015, there is plan to float a joint venture company with National Thermal Power Corporation holding 74% and Jharkhand government holding 26%. The new company will set up a 4000 MW (800 MW × 5) Patratu Super Thermal Power Project which will utilize 1500 acres out of 6300 acres available with the existing power plant.
Efforts are on to get the first unit of the NTPC Limited’s North Karanpura Thermal Power Station (3x660 MW), ready in 2021. [5] North Karanpura Coalfield of Central Coalfields Limited , spread over 1,230 square kilometres (470 sq mi) in the southern part of the district, with spill over to neighbouring districts, and having coal reserves of ...
NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants .
Efforts are on to get the first unit of the NTPC Limited’s North Karanpura Thermal Power Station (3x660 MW), ready in 2021. [5] North Karanpura Coalfield of Central Coalfields Limited , spread over 1,230 square kilometres (470 sq mi) in the southern part of the district, with spill over to neighbouring districts, and having coal reserves of ...