Heavy Girder Over Bridge The Heavy Girder Over Bridge (HGOB) provides a lower profile allowing easier crossing for heavy transporters and tankers on line of communication routes. The bridge is transported on 1 DROPS pallet of a 14 tonne truck. A Royal Engineers Section and a crane is used to construct the bridge.
Underslung (lower-beam) launching gantry used for Skyline guideway construction (2015). A launching gantry (also called bridge building crane, and bridge-building machine) is a special-purpose mobile gantry crane used in bridge construction, specifically segmental bridges that use precast box girder bridge segments or precast girders in highway and high-speed rail bridge construction projects.
The SLJ900/32 as aforementioned, is 91 metres (299 ft) long, 7 metres (23 ft) wide, 9 m (29 ft 6 in) tall and weighs around 580 tonnes (640 short tons). [4] Compared to conventional cranes which require clear land and are typically only able to lift a few meters of bridge material per-lift, the SLJ900/32 is capable of lifting an entire large segment of bridging material (some of which weigh ...
A girder bridge is a bridge that uses girders as the means of supporting its deck. [1] The two most common types of modern steel girder bridges are plate and box. [citation needed] The term "girder" is often used interchangeably with "beam" in reference to bridge design.
A movable scaffolding system (MSS) is a special-purpose self-launching form used in bridge construction, specifically prestressed concrete bridges with segments or spans that are cast in place. The movable scaffolding system is used to support a form while the concrete is cured; once the segment is complete, the scaffold and forms are moved to ...
In a plate girder bridge, the plate girders are typically I-beams made up from separate structural steel plates (rather than rolled as a single cross-section), which are welded or, in older bridges, bolted or riveted together to form the vertical web and horizontal flanges of the beam. In some cases, the plate girders may be formed in a Z-shape ...
An extradosed bridge employs a structure that combines the main elements of both a prestressed box girder bridge and a cable-stayed bridge. [1] [2]: 85 [3] The name comes from the word extrados, the exterior or upper curve of an arch, and refers to how the "stay cables" on an extradosed bridge are not considered as such in the design, but are instead treated as external prestressing tendons ...
All bridge elements are small enough to be transported by road and site operations can be carried out without skilled labour, special plant or heavy equipment. Because of the modular design, repairs are as structurally efficient as the original construction and at the end of service dismantled bridges can be reduced to initial components for reuse.