Shoring is designed to prevent collapse where shielding is only designed to protect workers when collapses occur. Concrete-structure and stone-building shoring, in these cases also referred to as falsework, provides temporary support until the concrete becomes hard and achieves the desired strength to support loads.
A slurry wall is a civil engineering technique used to build reinforced concrete walls in areas of soft earth close to open water, or with a high groundwater table. [1] This technique is typically used to build diaphragm (water-blocking) walls surrounding tunnels and open cuts, and to lay foundations .
Heavy construction equipment is usually used due to the amounts of material to be moved — up to millions of cubic metres. Earthwork construction was revolutionized by the development of the scraper and other earth-moving machines such as the loader, the dump truck, the grader, the bulldozer, the backhoe, and the dragline excavator.
Continuous flight augering can be used to construct a secant piled wall which can be used as a retaining wall or as shoring during excavation. Once initial piles are set with concrete, other shafts are augured between them, slicing into the original piles, with the new ones receiving rebar .
A jack post (telepost, adjustable steel column) is a steel post used in the construction trades for temporary support of ceilings, walls and trenches ().They are designed to be able to mechanically telescope to about twice their shortest length in order to span a wide variety of spaces.
With the design complete, construction is the next step. Most soil nail wall construction follows a specific procedure. First, a cut is excavated and temporary bracing is put in place if necessary. This is done with conventional earth moving equipment and hydraulic drills.
The tieback-deadman structure resists forces that would otherwise cause the wall to lean, as for example, when a seawall is pushed seaward by water trapped on the landward side after a heavy rain. Tiebacks are drilled into soil using a small diameter shaft, and usually installed at an angle of 15 to 45 degrees.
Trench shoring is the process of bracing the walls of a trench to prevent collapse and cave-ins. The phrase can also be used as a noun to refer to the materials used in the process. The phrase can also be used as a noun to refer to the materials used in the process.