enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    On-site concrete slabs are built on the building site using formwork - a type of boxing into which the wet concrete is poured. If the slab is to be reinforced, the rebars, or metal bars, are positioned within the formwork before the concrete is poured in. [26] Plastic-tipped metal or plastic bar chairs, are used to hold the rebar away from the ...

  4. Cast-in-place concrete - Wikipedia

    en.wikipedia.org/wiki/Cast-in-place_concrete

    Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]

  5. Voided biaxial slab - Wikipedia

    en.wikipedia.org/wiki/Voided_biaxial_slab

    Concrete is poured around these plastic forms to create internal voids in the slab A voided biaxial slab installation in Turkey. Voided biaxial slabs, sometimes called biaxial slabs or voided slabs, are a type of reinforced concrete slab which incorporates air-filled voids to reduce the volume of concrete required.

  6. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...

  7. Tremie - Wikipedia

    en.wikipedia.org/wiki/Tremie

    The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.

  8. Waffle slab foundation - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab_foundation

    Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.

  9. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...