Search results
Results from the WOW.Com Content Network
This is a 100 kVA set The mid-size stationary engine–generator pictured here is a 100 kVA set which produces 415 V at around 110 A . It is powered by a 6.7-liter turbocharged Perkins Phaser 1000 Series engine, and consumes approximately 27 liters of fuel an hour, on a 400-liter tank.
Set sizes range from 8 to 30-kW (also 8 to 30-kVA single phase) for homes, small shops, and offices, with the larger industrial generators from 8-kW (11 kVA) up to 2,000-kW (2,500-kVA three phase) used for office complexes, factories, and other industrial facilities. A 2,000-kW set can be housed in a 40 ft (12 m) ISO container with a fuel tank ...
Storing electricity by alternative systems such as batteries, compressed air storage systems, etc. is more costly than electricity production by standby generator. India has already established nearly 4,785 MW pumped storage capacity as part of its installed hydro power plants. [168] [169] Hydropower is a low-carbon, renewable electricity source.
On its completion in 1891, it was the first truly modern power station, supplying high-voltage AC power that was then "stepped down" for consumer use on each street. This basic system remains in use today around the world. A small early 1900s 75 kVA direct-driven power station AC alternator, with a separate belt-driven exciter generator.
The rotor of a turbo generator is a non-salient pole type usually with two poles. [5] The normal speed of a turbo generator is 1500 or 3000 rpm with four or two poles at 50 Hz (1800 or 3600 rpm with four or two poles at 60 Hz). The rotating parts of a turbo generator are subjected to high mechanical stresses because of the high operation speed.
In 1891, a 3,000 volts and 133 Hz single-phase generator of 100 horsepower was installed at Ames Hydroelectric Generating Plant which was belt-connected with Pelton water wheel. The power was transmitted through 4.2 kilometres (2.6 mi) cables to power an identical motor at the mill.
1 Ser = 2 Adher = 4 Pav = 16 Chattank = 80 Tola = 933.1 grams 1 Savaser = 1 Ser + 1 Pav (1¼ Seer) 1 Savaser weighed 100 Imperial rupees In Hindi 1¼ Seer = Sava (1¼) Seer, or Savaser 1 Dhaser = 2 Savaser = 2½ Seer In Hindi 2½ Seer = Dhai (2½) Seer, or Dhaser 1 Paseri = 2 Adisari = 5 Seer In Hindi 5 Seer = Panch (5) Seer, or Paseri for short
It will use the same F118-101 turbofan and generator as the U-2, but thrust could increase to 19,000 pounds (8,600 kg) and power increased to 65–75 kVA; service ceiling would increase to 77,000 ft (23,000 m) with a second engine.