Search results
Results from the WOW.Com Content Network
At the end of the 4th day, about 200,000 passengers had already commuted on Namma Metro. Namma Metro's first 12-day cumulative revenue was ₹1 crore (US$100,000). [35] The northern section of Green Line (Reach 3, 3A, 3B) was initially scheduled to be opened by the end of 2012. However, it was delayed and finally opened on 1 March 2014. [36]
The Yellow Line of Namma Metro is a nearly-completed part of the metro rail network of Bengaluru, India. The 18.82 km (11.69 mi)-long line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. [1] R.V. Road station is the terminal station within the city, with an interchange with the Green Line.
The metro service runs from 5 am and 12 am daily. The end-to-end travel time on a Purple Line train is 82 minutes. [67] From 7 November 2016, Purple Line trains began running at an interval of every 4 minutes between 9:10 am and 9:58 am to handle rising passenger traffic during morning peak hour. [68]
Phase-3A of Namma Metro has been planned to become operational around the year 2030. [1] [2] [3] As per latest news updates, the Karnataka Cabinet had approved the Phase 3A of this metro line, linking Sarjapur in southeastern Bengaluru with Hebbal in the north on December 6, 2024. The approval from the Union Cabinet is awaited, as the Centre ...
On June 10, 2024, Rail Vikas Nigam Ltd. (RVNL) disclosed in a BSE filing that its joint venture with Siemens has secured a contract worth approximately Rs. 762 crore from Bangalore Metro Rail Corporation. This contract encompasses the 750V DC third rail electrification work under package EPC5-CC for the 57 km Blue Line of the Namma Metro. [42]
The Namma Metro (English: Our metro), also known as Bangalore Metro, is the rapid transit system serving the city of Bangalore in India. [1] Out of the operational 68 metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. [2] [3] Evolution of Namma Metro
Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The 30.5 km (19.0 mi) line connects Madavara in the northwest to Silk Institute in the south.
The Pink Line of Namma Metro is under construction and will form part of the metro rail network for the city of Bangalore, Karnataka, India.The 21.25 km (13.20 mi) line connects Kalena Agrahara station (previously named Gottigere) on Bannerghatta Road in the south with Nagawara station on Outer Ring Road in the north.