Search results
Results from the WOW.Com Content Network
First fix comprises all the work needed to take a building from foundation to putting plaster on the internal walls. This includes constructing walls, floors and ceilings, and inserting cables for electrical supply and pipes for water supply.
This enables installation of skirting boards above floor level without fear of puncturing it. Alternatively, instead of fitting separate inner and outer DPCs, it is common in commercial housebuilding to use a one-piece length of rigid plastic (with an angled section) that fits neatly across the cavity and slots into both walls (a cavity tray).
Various sized cuts of 1 ⁄ 2 in (13 mm) drywall with tools for maintenance and installation . Drywall (also called plasterboard, dry lining, [1] wallboard, sheet rock, gib board, gypsum board, buster board, turtles board, slap board, custard board, gypsum panel and gyprock) is a panel made of calcium sulfate dihydrate (), with or without additives, typically extruded between thick sheets of ...
Lath seen from the back with white plaster coat oozing through. Lath and plaster is a building process used to finish mainly interior dividing walls and ceilings. It consists of narrow strips of wood which are nailed horizontally across the wall studs or ceiling joists and then coated in plaster.
Membrane roofing is a type of roofing system for buildings, RVs, ponds, and, in some cases, tanks. It is used to create a watertight covering to protect the interior of a building. Membrane roofs are most commonly made from synthetic rubber, thermoplastic (PVC or similar material), or modified bitumen. Membrane roofs are most commonly used in ...
The basement membrane, also known as base membrane, is a thin, pliable sheet-like type of extracellular matrix that provides cell and tissue support and acts as a platform for complex signalling. [ 1 ] [ 2 ] The basement membrane sits between epithelial tissues including mesothelium and endothelium , and the underlying connective tissue.
A ceiling can also be the upper limit of a tunnel. The most common type of ceiling is the dropped ceiling, [citation needed] which is suspended from structural elements above. Panels of drywall are fastened either directly to the ceiling joists or to a few layers of moisture-proof plywood which are then attached to the joists. Pipework or ducts ...
Typically, drywall is surfaced using the "mud-and-tape" method, where non-adhesive paper or mesh tape and drywall joint compound ("mud") is used to fill joints, cover nail heads, and repair any flaws. Plaster veneer was developed as a way of taking advantage of the reduced labor of modern drywall, while providing a genuine plaster surface for a ...