Search results
Results from the WOW.Com Content Network
Takt time, or simply takt, is a manufacturing term to describe the required product assembly duration that is needed to match the demand.Often confused with cycle time, takt time is a tool used to design work and it measures the average time interval between the start of production of one unit and the start of production of the next unit when items are produced sequentially.
At the process level, this ratio is known as operational cycle-time. Takt time is typically used to calculate the "line design" or number and disposition of physical resources required to produce a given mix and volume of products that changes on a daily basis according to customer demand.
Holloman and Jaffe determined the value of C experimentally by plotting hardness versus tempering time for a series of tempering temperatures of interest and interpolating the data to obtain the time necessary to yield a number of different hardness values. This work was based on six different heats of plain carbon steels with carbon contents ...
A DoS value of 100% meaning that demand and capacity are equal and no further traffic is able to progress through the junction. The formula to calculate DoS is: Degree of saturation = (demand x cycle time) / (saturation flow x effective green time) Values over 85%-90% typically indicate traffic congestion, with queues of vehicles beginning to form.
where is the time average power loss per unit volume in mW per cubic centimeter, is frequency in kilohertz, and is the peak magnetic flux density; , , and , called the Steinmetz coefficients, are material parameters generally found empirically from the material's B-H hysteresis curve by curve fitting. In typical magnetic materials, the ...
Low cycle fatigue (LCF) has two fundamental characteristics: plastic deformation in each cycle; and low cycle phenomenon, in which the materials have finite endurance for this type of load. The term cycle refers to repeated applications of stress that lead to eventual fatigue and failure; low-cycle pertains to a long period between applications.
Some materials (e.g., some steel and titanium alloys) exhibit a theoretical fatigue limit below which continued loading does not lead to fatigue failure. High cycle fatigue strength (about 10 4 to 10 8 cycles) can be described by stress-based parameters. A load-controlled servo-hydraulic test rig is commonly used in these tests, with ...
Run 4 shows how these improvements can get you back to the same production time but now with more flexibility in production capacity. Run N (not illustrated) would have changeovers that take 1.5 minutes (97% reduction) and whole shift time reduced from 420 minutes to 368 minutes a productivity improvement of 12%.