Search results
Results from the WOW.Com Content Network
It has lower energy efficiency than some other technologies, but it has several other advantages. Producing boreholes with wide range of diameters or drilling in water environment can be mentioned. The research team from Slovakia has developed drilling concept based on utilization of electrical plasma.
A borehole shall be advanced incrementally to permit intermittent or continuous sampling. Intervals are typically 1.5 m (5 ft) or less in homogeneous strata. Tests and sampling should be done at every change in strata. After the borehole has been advanced to a desired depth and excess cuttings have been removed, testing and sampling can be ...
In the Eurocode series of European standards (EN) related to construction, Eurocode 7: Geotechnical design (abbreviated EN 1997 or, informally, EC 7) describes how to design geotechnical structures, using the limit state design philosophy. It is published in two parts; "General rules" and "Ground investigation and testing".
A borehole is a narrow shaft bored in the ground, either vertically or horizontally. A borehole may be constructed for many different purposes, including the extraction of water ( drilled water well and tube well ), other liquids (such as petroleum ), or gases (such as natural gas ).
Well logging, also known as borehole logging is the practice of making a detailed record (a well log) of the geologic formations penetrated by a borehole.The log may be based either on visual inspection of samples brought to the surface (geological logs) or on physical measurements made by instruments lowered into the hole (geophysical logs).
Sand packs must be installed at the screen depths and seals in the borehole are constructed between the sand packs. Nested wells are different from well clusters in that the latter consists of a cluster of wells where tubes or pipes are constructed in separate, individual boreholes that are drilled and completed at different depths.
Well logging operations can either be performed during the drilling process (see Logging While Drilling), to provide real-time information about the formations being penetrated by the borehole, or once the well has reached Total Depth and the whole depth of the borehole can be logged. Real-time data is recorded directly against measured cable ...
The Kola Superdeep Borehole was a similar project of the USSR in the 1970s and early 1980s the USSR attempted to drill a hole through the crust, to sample the Mohorovičić discontinuity. The deepest hole ever drilled failed not because of lack of money or time, but because of rock physics at depth.