Search results
Results from the WOW.Com Content Network
depth, deep, down: Defines the depth of a feature. ⌀ [2] diameter: Diameter of a circle. In a feature control frame , the ⌀ symbol tells you that the tolerance zone for the geometric tolerance is cylindrical. Abbreviations for "diameter" include ⌀, DIA, and D. D: diameter; delta: Abbreviations for "diameter" include ⌀, DIA, and D.
Download QR code; In other projects ... The engineering symbol for "down" or hole depth. Date: 29 December 2009: Source: Own work: ... 1=The engineering symbol for ...
This is a list of free and open-source software for geological data handling and interpretation. The list is split into broad categories, depending on the intended use of the software and its scope of functionality. Notice that 'free and open-source' requires that the source code is available and users are given a free software license.
The compass is used to draw arcs and circles. A drawing board was used to hold the drawing media in place; later boards included drafting machines that sped the layout of straight lines and angles. Tools such as templates and lettering guides assisted in the drawing of repetitive elements such as circles, ellipses, schematic symbols and text.
A datum reference or just datum (plural: datums [Note 1]) is some important part of an object—such as a point, line, plane, hole, set of holes, or pair of surfaces—that serves as a reference in defining the geometry of the object and (often) in measuring aspects of the actual geometry to assess how closely they match with the nominal value, which may be an ideal, standard, average, or ...
Printer tracking dots, also known as printer steganography, DocuColor tracking dots, yellow dots, secret dots, or a machine identification code (MIC), is a digital watermark which many color laser printers and photocopiers produce on every printed page that identifies the specific device that was used to print the document.
Construction cost estimating software is computer software designed for contractors to estimate construction costs for a specific project. A cost estimator will typically use estimating software to estimate their bid price for a project, which will ultimately become part of a resulting construction contract. Some architects, engineers ...
Driller's depth is always recorded, and it constitutes the primary depth system, unless it is later superseded by a more accurate measurement such as the depth from an open- or cased-hole wireline log. Driller's depth should always have 1) a unit of measurement e.g. meter or feet, 2) a datum reference e.g. rig floor.