Search results
Results from the WOW.Com Content Network
On 3 January 2012, the Karnataka government approved a budget of ₹ 27,000 crore (US$3.2 billion) for Phase 2 of Namma Metro project. [145] Phase 2 is estimated to cost ₹ 26,405 crore (US$3.1 billion). Land acquisition is expected to account for ₹ 5,000 crore (US$590 million). [141]
The Namma Metro (English: Our metro), also known as Bangalore Metro, is the rapid transit system serving the city of Bangalore in India. [1] Out of the operational 68 metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. [2] [3] Evolution of Namma Metro
Krantivira Sangolli Rayanna Railway Station (formerly known as City Railway Station) is an underground metro station on the East-West corridor of the Purple Line of Namma Metro which serves the Subhash Nagar area, Sevashrama area in Bangalore, India. It was opened to the public on 30 April 2016.
It spreads across 850 square metres. [13] Further plans include a two-tier walkway with a museum, art gallery, amphitheatre and children's play area located on the ground floor. The first floor of the walkway will lead to the first floor/concourse of the metro station and both floors will be equipped with internationally designed toilets.
The station was named Mantri Square Sampige Road due to a PPP agreement between the Bangalore Metro Rail Corporation Ltd (BMRCL) and Mantri. [3] Mantri Square is a shopping mall located near the station. [4] The station area covers around 80,000 sq feet. A bridge connecting the station to the first floor of the mall was inaugurated on 20 August ...
Thalaghattapura is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. [1] [2] This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension. [3] [4]
South End Circle is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Basavanagudi area of Bengaluru, India. It was opened to the public on 18 June 2017.
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Central Silk Board metro station along the 6.340 km Reach 5 – Package 3 section (Central Silk Board - Rashtreeya Vidyalaya Road) of the 18.825 km Yellow Line of Namma Metro.