Search results
Results from the WOW.Com Content Network
Collects steam at the top of the boiler (well above the water level) so that it can be fed to the engine via the main steam pipe, or dry pipe, and the regulator/throttle valve. [2] [5] [6]: 211–212 [3]: 26 Air pump / Air compressor Westinghouse pump (US+) Powered by steam, it compresses air for operating the train air brake system.
The weight of the pump equipment down in the mine, transferred by the walking beam, draws the piston up, and as the piston comes up, steam is transferred through the equilibrium pipe from above the piston to the bottom of the cylinder below the piston. When the piston reaches the top of the cylinder, the cycle is ready to repeat.
The pump manufacturer, Christian Ølgaard, developed a pump with a special knife system to meet the need for macerating and pumping manure in agricultural applications. Manure with high solids content, containing straw and sawdust, would clog up other types of pumps, causing unstable operation in an environment which required high reliability.
Piping and instrumentation diagram of pump with storage tank. Symbols according to EN ISO 10628 and EN 62424. A more complex example of a P&ID. A piping and instrumentation diagram (P&ID) is defined as follows: A diagram which shows the interconnection of process equipment and the instrumentation used to control the process.
While pipe sizes in Australia are inch-based, they are classified by outside rather than inside diameter (e.g., a nominal 3 ⁄ 4 inch copper pipe in Australia has measured diameters of 0.750 inches outside and 0.638 inches inside, whereas a nominal 3 ⁄ 4 inch copper pipe in the U.S. and Canada has measured diameters of 0.875 inch outside and ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
Process piping and power piping are typically checked by pipe stress engineers to verify that the routing, nozzle loads, hangers, and supports are properly placed and selected such that allowable pipe stress is not exceeded under different loads such as sustained loads, operating loads, pressure testing loads, etc., as stipulated by the ASME B31, EN 13480, GOST 32388, RD 10-249 or any other ...
front cover G1 1930. This is the Group G series List of the United States military vehicles by (Ordnance) supply catalog designation, – one of the alpha-numeric "standard nomenclature lists" (SNL) that were part of the overall list of the United States Army weapons by supply catalog designation, a supply catalog that was used by the United States Army Ordnance Department / Ordnance Corps as ...