enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Rebar - Wikipedia

    en.wikipedia.org/wiki/Rebar

    Rebar has been placed atop a temporary wooden formwork deck prior to pouring concrete. The large horizontal rebar "cages" will be encased within a beam, while several thick vertical rebar stubs will stick out of the pour to form the base of a future column. Concrete is a material that is very strong in compression, but relatively weak in tension.

  3. Tie rod - Wikipedia

    en.wikipedia.org/wiki/Tie_rod

    A tie rod or tie bar (also known as a hanger rod if vertical) is a slender structural unit used as a tie and (in most applications) capable of carrying tensile loads only. It is any rod or bar-shaped structural member designed to prevent the separation of two parts, as in a vehicle. Tie rods and anchor plates in the ruins of Coventry Cathedral

  4. Reinforced concrete - Wikipedia

    en.wikipedia.org/wiki/Reinforced_concrete

    The plate assemblies are fabricated off site, and welded together on-site to form steel walls connected by stringers. The walls become the form into which concrete is poured. Steel plate construction speeds reinforced concrete construction by cutting out the time-consuming on-site manual steps of tying rebar and building forms.

  5. Steel fixer - Wikipedia

    en.wikipedia.org/wiki/Steel_fixer

    A steel fixer with column reinforcement steel Fixing reinforcement for foundations and walls of sewage pump station in Sacramento, California. A steel fixer (UK, ironworker or "rod buster" in the United States) is a tradesman who positions and secures steel reinforcing bars, also known as rebar, and steel mesh used in reinforced concrete on construction projects.

  6. Metal expansion joint - Wikipedia

    en.wikipedia.org/wiki/Metal_expansion_joint

    It consists of two metal bellows with an intermediate pipe and connectors on both sides. As a special form of the axial expansion joint, the universal expansion joint has only a limited pressure resistance for stability reasons and, moreover, loads the adjacent pipe supports with the axial compressive force resulting from the internal pressure.

  7. Hold down (structural engineering) - Wikipedia

    en.wikipedia.org/wiki/Hold_down_(structural...

    Holdown (holdown, hold-down, or hold down) or tie-down in structural engineering refers to the steel device or hardware that is installed at the end of a plywood shear wall. The hold downs provide uplift resistance against the overturning moment imposed on the wall due to "in-plane" lateral load applied at the top of the wall.

  8. Structural engineering - Wikipedia

    en.wikipedia.org/wiki/Structural_engineering

    Structural engineers also must understand and calculate the stability, strength, rigidity and earthquake-susceptibility of built structures for buildings [1] and nonbuilding structures. The structural designs are integrated with those of other designers such as architects and building services engineer and often supervise the construction of ...

  9. Darcy–Weisbach equation - Wikipedia

    en.wikipedia.org/wiki/Darcy–Weisbach_equation

    Darcy–Weisbach equation calculator; Pipe pressure drop calculator Archived 2019-07-13 at the Wayback Machine for single phase flows. Pipe pressure drop calculator for two phase flows. Archived 2019-07-13 at the Wayback Machine; Open source pipe pressure drop calculator. Web application with pressure drop calculations for pipes and ducts