Search results
Results from the WOW.Com Content Network
Animation depicting construction of multi-story building using aluminum handset formwork. Steel and plywood formwork for poured in place concrete foundation. Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1]
The beams and formwork are typically set by hand and pinned, clipped, or screwed together. The advantages of a modular system are: does not require a crane to place the formwork, speed of construction with unskilled labor, formwork modules can be removed after concrete sets leaving only beams in place prior to achieving design strength.
Doka’s business is based on a combination of production, equipment sale & rental, engineering and maintenance. Most of the formwork production takes place at Doka's central plant in Amstetten. [7] The Doka three-ply sheets are made in the branch plant in Banská Bystrica in Slovakia.
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
Precast concrete is a construction product produced by casting concrete in a reusable mold or "form" which is then cured in a controlled environment, transported to the construction site and maneuvered into place; examples include precast beams, and wall panels, floors, roofs, and piles.
Climbing formwork, also known as jumpform, is a special type formwork for vertical concrete structures that rises with the building process. While relatively complicated and costly, it can be an effective solution for buildings that are either very repetitive in form (such as towers or skyscrapers) or that require a seamless wall structure ...
In-situ evaluation of silane treated concrete cast using Zemdrain formwork liner at Dock street bridge, Belfast. Internal report to Du pont De Nemours, Luxembourg, Report No - TAS 139, June, 1992, p. 8, (Unpublished). Reddi, S.A. Permeable formwork for impermeable concrete. Indian Concrete Journal, January, 1992, pp. 31–35.
The engineering study of every reinforced concrete construction, whether it is a building, a bridge, a bearing wall, or another structure, dictates the positioning of steel rebars at specific positions in the volume of concrete (predicted concrete cover of steel reinforcement bars). This cover varies between 10 mm and 100 mm.