Ads
related to: simpson strong tie slip clip system for concrete slab
Search results
Results from the WOW.Com Content Network
The company was founded by Barclay Simpson in Oakland in 1956, as a successor to his father's window screen company. [1] Simpson manufactured joist hangers and the company's subsidiary Simpson Strong-Tie Co. Inc. became a dominant producer of structural connectors in North America and Europe. [1]
A hurricane tie used to fasten a rafter to a stud. A tie, strap, tie rod, eyebar, guy-wire, suspension cables, or wire ropes, are examples of linear structural components designed to resist tension. [1] It is the opposite of a strut or column, which is designed to resist compression. Ties may be made of any tension resisting material.
Strong tie may refer to: Simpson Strong Tie, a subsidiary and brand of structural hardware produced by the Simpson Manufacturing Company; Interpersonal ties, in sociology
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Rebar (short for reinforcement bar or reinforcing bar), known when massed as reinforcing steel or steel reinforcement, [1] is a tension device added to concrete to form reinforced concrete and reinforced masonry structures to strengthen and aid the concrete under tension. Concrete is strong under compression, but has low tensile strength.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
The floor systems are mostly built from pre-topped double tees. This system evolved from the earlier use of tee systems where the flanges of the T-beams were connected. The concrete is then poured at the top of the tees during the construction to create the floor surface, hence the process is called field-placed concrete topping.
Pre-tensioned concrete is a variant of prestressed concrete where the tendons are tensioned prior to the concrete being cast. [1]: 25 The concrete bonds to the tendons as it cures, following which the end-anchoring of the tendons is released, and the tendon tension forces are transferred to the concrete as compression by static friction.
Ads
related to: simpson strong tie slip clip system for concrete slab