Search results
Results from the WOW.Com Content Network
The majority of trench maps were to a scale of 1:10,000 or 1:20,000, although trench maps also frequently appeared on a scale of 1:5,000 (maps printed on a large scale such as 1:5,000, were generally meant for use in assaults). In addition, the British army also printed maps on scales smaller than 1:20,000, such as 1:40,000 and 1:100,000, but ...
It is recommended to name the SVG file “Military trench schematic, showing parapet, parados etc.svg”—then the template Vector version available (or Vva) does not need the new image name parameter.
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Donate; Pages for logged out editors learn more
The guidelines for British trench construction stated that it would take 450 men 6 hours at night to complete 250 m (270 yd) of front-line trench system. Thereafter, the trench would require constant maintenance to prevent deterioration caused by weather or shelling. Trenchmen were a specialized unit of trench excavators and repairmen.
W Beach, Helles, on January 7, 1916, just prior to the final evacuation of British forces during the Gallipoli Campaign. The Gallipoli Campaign (also called the "Dardanelles Campaign"), was a number of battles fought between 1915 and 1916.
During World War I, Sir Ernest William Moir produced a design for concrete machine-gun pillboxes [5] constructed from a system of interlocking precast concrete blocks, with a steel roof. Around 1,500 Moir pillboxes were eventually produced (with blocks cast at Richborough in Kent) and sent to the Western Front in 1918.
Trench raiding was a feature of trench warfare which developed during World War I. It was the practice of making small scale night-time surprise attacks on enemy positions. It was the practice of making small scale night-time surprise attacks on enemy positions.
The "Système Péchot" as it is named in French became the dominant system for trench railways with an estimated 7,500 km (4,700 mi) of track built by the 5th engineer regiment. 250 8-tonne (7.9-long-ton; 8.8-short-ton) 0-6-0T of Decauville's Progres design were built for military service. 32 0-6-0T of American design and 600 55 kW (74 hp ...