enow.com Web Search

  1. Ads

    related to: minimum deck clearance from ground fence to wood frame

Search results

  1. Results from the WOW.Com Content Network
  2. Clearance (civil engineering) - Wikipedia

    en.wikipedia.org/wiki/Clearance_(civil_engineering)

    For roads without curbs, the clearance for that is 1.5 metres (4 ft 11 in) given that the minimum clearance from the center line of the roads is 5 metres (16 ft 5 in). [ 21 ] For roadways that require passing under some structures such as tunnels, there are standards on the entire width of the roads known as horizontal curb-to-curb and wall-to ...

  3. Sill plate - Wikipedia

    en.wikipedia.org/wiki/Sill_plate

    In modern wood construction, sills usually come in sizes of 2×4, 2×6, 2×8, and 2×10. In stick framing , the sill is made of treated lumber , and is anchored to the foundation wall, often with J-bolts , to keep the building from coming off the foundation during a severe storm or earthquake.

  4. Loading gauge - Wikipedia

    en.wikipedia.org/wiki/Loading_gauge

    The body frame may have a maximum height of 4,500 mm (14 ft 9 in) and a maximum width of 3,400 mm (11 ft 2 in) with additional installations allowed up to 3,600 mm (11 ft 10 in). That width of 3,400 mm is only allowed above 1,250 mm (4 ft 1 in) as the common passenger platforms are built to former standard trains of 3,200 mm (10 ft 6 in) in width.

  5. Structure gauge - Wikipedia

    en.wikipedia.org/wiki/Structure_gauge

    The code also defines the clearance that is shorter than the physical clearance to account for sag curves, bridge deflection and expected settlements with a recommendation of minimum clearance of 5 metres (16 ft 5 in). [2] In UK, the "standard minimum clearance" for structures over public highways is 16 feet 6 inches (5.03 m). [3]

  6. Simple actions can make a big difference to protect homes ...

    www.aol.com/simple-actions-big-difference...

    All wood piles should have a minimum of 10 feet of clearance in all directions. Zone 3 is the access zone, making sure to clear a path so even if embers are falling, residents can get out and ...

  7. Deck railing - Wikipedia

    en.wikipedia.org/wiki/Deck_railing

    In between the posts, two 2x4s are attached to the posts with screws for the best connection. The lower board is placed 3.5" from the top of the finish deck to the bottom of the board. The top board is placed with the top at 35" from the deck. Then the vertical 2x2 pressure treated wood balusters are installed spaced regularly every 3.5". Then ...

  8. Post (structural) - Wikipedia

    en.wikipedia.org/wiki/Post_(structural)

    In wood construction posts normally land on a sill, but in rare types of buildings the post may continue through to the foundation called an interrupted sill or into the ground called earthfast, post in ground, or posthole construction. A post is also a fundamental element in a fence.

  9. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  1. Ads

    related to: minimum deck clearance from ground fence to wood frame