  2. Vindhyachal Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Vindhyachal_Thermal_Power...

    The Vindhyachal Thermal Power Station is located in Singrauli district in the Indian state of Madhya Pradesh.One of the coal-fired power stations of NTPC, it is the largest power station in India, and the 10th largest coal-fired power station in the world, with an installed capacity of 4,760 MW with total of 4783 MW. [1]

  3. Vallur Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Vallur_Thermal_Power_Station

    The plant has six induced draft cooling towers (IDCTs), which have a capacity of 30,000 cubic metres per hour (1,100,000 cu ft/h) with nine cells of 14 by 21 metres (46 ft × 69 ft) each. [4] The IDCTs use seawater, which is drawn from the intake channel of North Chennai Thermal Power Station , and fresh water requirement is met from a ...

  4. NTPC Limited - Wikipedia

    en.wikipedia.org/wiki/NTPC_Limited

    Later in 2002, its installed capacity crossed 20,000 MW. [10] NTPC got listed on BSE and NSE on 5 November 2004. Against the issue price of ₹62 per share, it closed the first day of listing with ₹75.55 per share. [13] On the day of listing, it became the third largest company in India in terms of market capitalisation. [14]

  5. Power sector of Andhra Pradesh - Wikipedia

    en.wikipedia.org/wiki/Power_sector_of_Andhra_Pradesh

    Andhra Pradesh is also leader by installing 433 nos electric vehicle charging stations (EVCS) out of 927 nos installed in the entire country as on 30 June 2020. [ 10 ] Under the program of installing 500 GW capacity of renewable power capacity by 2030, nearly 59 GW (25%) of solar and wind power is identified out of 236.58 GW in three districts ...

  6. Feroze Gandhi Unchahar Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Feroze_Gandhi_Unchahar...

    Feroze Gandhi Unchahar Thermal Power Plant has an installed capacity of 1,550 megawatts (2,080,000 hp), inclusive of Fourth Stage, that got operational in April 2017. The First unit was commissioned in November 1988. The coal for the plant is derived from North Karanpura Coalfield. The water source is from Sarda Sahyak Canal. [3]

  7. Sipat Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Sipat_Thermal_Power_Station

    The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...

  8. Solapur Super Thermal Power Station - Wikipedia

    en.wikipedia.org/wiki/Solapur_Super_Thermal...

    The power station has a planned capacity of 1320 MW (2x660 MW). [4] The first unit of Solapur Super Thermal power station was commissioned and declared commercial on 25 September 2017. [ 5 ]

  9. Faridabad Combined Cycle Power Plant - Wikipedia

    en.wikipedia.org/wiki/Faridabad_Combined_Cycle...

    Faridabad Combined Cycle Gas Power Plant or NTPC Faridabad is located at Faridabad, in Faridabad district in the Indian state of Haryana. The power plant is one of the gas-based power plants owned by NTPC. The gas for the power plant is sourced from GAIL HBJ Pipeline. Source of water for the power plant is Rampur distributories of Gurgaon canal.