Search results
Results from the WOW.Com Content Network
A sailor checks the outside diameter of a shear pin in the machinery repair shop aboard US aircraft carrier John C. Stennis. A shear pin is a mechanical detail designed to allow a specific outcome to occur once a predetermined force is applied. It can either function as a safeguard designed to break to protect other parts, or as a conditional ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
Concrete can also be prestressed (reducing tensile stress) using internal steel cables (tendons), allowing for beams or slabs with a longer span than is practical with reinforced concrete alone. Inspection of existing concrete structures can be non-destructive if carried out with equipment such as a Schmidt hammer , which is sometimes used to ...
The Wood–Armer method is a structural analysis method based on finite element analysis used to design the reinforcement for concrete slabs. [1] This method provides simple equations to design a concrete slab based on the output from a finite element analysis software.
The last are used in concrete-steel composite structures as shear connectors. [6] Other uses include anchoring machines to poured concrete floors [7] and buildings to their concrete foundations. Various typically disposable aids, mainly of plastic, are produced to secure and align cast-in-place anchors prior to concrete placement.
The anchor selection, together with additional reinforcement, and rigging arrangements is influenced by: - The dead weight of the element - The number of anchors in the element and the configuration of the anchor - Capacity of the anchor at the specific concrete compressive strengths at time of lift - The dynamic loads applied during lifting ...
Double tees are connected during the construction without topping with concrete to create the parking structure floor surface. [6] A benefit of pre-topped double tees is a higher quality concrete for more durable surface to reduce traffic wears. Factories can produce the topping with minimum concrete strength of 5,000 psi. In some areas, the ...