Search results
Results from the WOW.Com Content Network
List of gas-fired plants in Malaysia; Plant State Coordinates MW Type Owner/operator Refs Connaught Bridge Power Station: Selangor at Klang: 832: Combined cycle (1 ST, 2 GT), open cycle (4 GT) Tenaga Nasional Berhad: Genting Sanyen Kuala Langat Power Plant: Selangor at Kuala Langat
A Rankine cycle with two steam turbines and a single open feedwater heater. A feedwater heater is a power plant component used to pre-heat water delivered to a steam generating boiler. [1] [2] [3] Preheating the feedwater reduces the irreversibilities involved in steam generation and therefore improves the thermodynamic efficiency of the system ...
The feed water cycle begins with condensate water being pumped out of the condenser after traveling through the steam turbines. The condensate flow rate at full load in a 500 MW plant is about 6,000 US gallons per minute (400 L/s). Diagram of boiler feed water deaerator (with vertical, domed aeration section and horizontal water storage section).
The greatest variation in the design of steam–electric power plants is due to the different fuel sources. Almost all coal, nuclear, geothermal, solar thermal electric power plants, waste incineration plants as well as many natural gas power plants are steam–electric. Natural gas is frequently combusted in gas turbines as well as boilers.
In this design, the inlet feedwater follows a continuous path without segmented sections for economizers, evaporators, and superheaters. This provides a high degree of flexibility as the sections are allowed to grow or contract based on the heat load being received from the gas turbine.
Most central stations are fossil fuel power plants and nuclear power plants; some installations use geothermal steam, or use concentrated solar power (CSP) to create the steam. Steam turbines can also be used directly to drive large centrifugal pumps , such as feedwater pumps at a thermal power plant .
Jimah Power Plant (also known as Jimah East Coal-Fired Power Plant or Stesen Janakuasa Tuanku Muhriz) is a 2GW ultra-supercritical coal-fired power station situated in Port Dickson District, Malaysia.
The economiser is a crucial component for efficient performance of a thermal power plant. It is a non-steaming type of heat exchanger which is placed in the convective zone of the furnace. It takes the heat energy of the flue gases for heating the feed water before it enters the boiler drum.