Mountain Hydro Nepal (P.) Ltd Mai Cascade Hydropower Station: Ilam District: 8 2074-12-26 BS Himal Dolkha Hydropower Company Pvt Ltd Chhandi Khola Hydropower Station: Lamjung District: 2 2072-12-13 BS Chhyandi Hydropower Co. P. Ltd Puwa Khola-1 Hydropower Station: Ilam District: 4 2074-06-23 BS Puwa Khola – 1 Hydropower Pvt. Ltd Rudi A ...
The Upper Tamakoshi Hydroelectric Project is a 456 MW peaking run-of-the-river hydroelectric project in Nepal. [1] It is the largest hydroelectric project in Nepal, operating since July 2021. [2] [3] It is sited on the Tamakoshi River (also spelled Tama Koshi), a tributary of the Sapt Koshi river (also spelled Saptakoshi), near the Nepal ...
The Kulekhani Dam is a rock-fill dam on the Kulekhani River near Kulekhani in the Indrasarowar Rural Municipality of Makwanpur District in Bagmati Province, Nepal.The primary purpose of the dam is hydroelectric power generation and it supports the 60 MW Kulekhani I, 32 MW Kulekhani II and 14 MW Kulekhani III Hydropower Stations.
The Upper Karnali Storage Hydropower Project is a proposed run-of-the-river hydroelectric plant on the Karnali river in Nepal. It will have an installed capacity of 900 MW, making it the largest hydropower plant in Nepal when achieved. [ 1 ]
Modi Khola Hydroelectric Power Plant (Nepali: मोदी खोला जलविद्युत आयोजना, Modi Khola Jalbidyut Ayojana) is a run-of-river hydro-electric plant located in Parbat district of Nepal. The flow from Modi River is used to generate 14.8 MW electricity. [3] Annual energy generation capacity is 92.5 GWh.
Phawa Khola Hydropower Station (Nepali:फावा खोला जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in Taplejung District of Nepal. The flow from Phawa River is used to generate 5 MW electricity. [1] The plant is owned and developed by Shiwani Hydropower Company, an IPP of Nepal.
The hydropower project is also the biggest hydropower project of Nepal. The dam and headworks are situated on the Gandaki River at the confluence of the Andhikhola whereas the power house is located downstream, around a bend in the river, in Beltari (About 7 km towards the South-East of Mirmi).
Rudi A Hydropower Station (Nepali: रुदी A जलविद्युत आयोजना) is a run-of-river hydro-electric plant located in the Kaski District of Nepal that came into operation in 2019. The flow from the Rudi River is used to generate 8.8 MW electricity.