Ad
related to: andheri to versova distance by car route
Search results
Results from the WOW.Com Content Network
The 17.17-kilometre (10.67 mi) bridge will connect Versova, a neighbourhood in the suburb of Andheri to the Bandra–Worli Sea Link in Bandra, as part of the Coastal Road. [9] The 8-lane sea link is expected to reduce congestion on the Western Express Highway and the Western Line of the Mumbai Suburban Railway. [10] [11]
Line 1 connects Versova in the Western Suburbs to Ghatkopar in the Central Suburbs, covering a distance of 11.4 kilometres (7.1 mi). [48] It is fully elevated, and consists of 12 stations. [48] Work on the Versova-Andheri-Ghatkopar corridor, a part of Phase I, began on 8 February 2008.
A section of the line from Dahisar East to Aarey was opened on 2 April 2022, and another section from Aarey to Gundavli in Andheri (East) was inaugurated on 19 January 2023. An under construction 11.386 km section of Line 7, from Bhayander to Dahisar, is part of Red Line 9. A southward extension to the airport is also currently under construction.
The Versova-Andheri-Ghatkopar corridor was chosen as the first line in the master plan to be implemented. The Mumbai Suburban Railway connects Mumbai from north to south. However, east–west connectivity is poor. The Versova-Ghatkopar route had no suburban rail link and was serviced by either BEST buses, autos or taxis. [10]
A 38.24 km (23.76 mi) long Colaba–Bandra–Charkop line was proposed as Line 2 in the original Mumbai Metro masterplan unveiled by the MMRDA in 2004. A 13.37 km (8.31 mi) long Bandra-Kurla–Mankhurd line and a 7.5 km (4.7 mi) line from Charkop to Dahisar were proposed as Line 3 and Line 4, respectively, in the same plan.
Line 1 of the Mumbai Metro spans the entire suburb of Andheri (Andheri metro station) [7] [8] connecting Versova in the west to Ghatkopar in the Eastern Suburbs, covering a distance of 11.4 kilometres (7.1 mi). [9] It is fully elevated, and consists of 12 stations, nine of which are in Andheri. Work on the corridor began on 8 February 2008.
The project aims to ease congestion caused by the spillover of commuters from the Versova-Andheri-Ghatkopar Metro-1 into the rail premises. A new 12-metre-wide and 75-metre-long foot over bridge (FOB) was constructed to connect the east and west sides of the station, along with platforms 1/2/3/4.
Versova is the elevated western terminal metro station on the East-West Corridor of the Blue Line 1 of Mumbai Metro serving the Seven Bungalows, Yari Road and Versova neighbourhoods of Andheri in Mumbai, India. It opened to the public on 8 June 2014 and consists of two side platforms. [3] The station is located at Seven Bungalows. [4]
Ad
related to: andheri to versova distance by car route