Search results
Results from the WOW.Com Content Network
The power plant is one of the coal based power plants of NTPC Limited. [2] In the year 1992, Uttar Pradesh State Electricity Board (U.P.S.E.B.) transferred Unchahar Thermal Power Station to NTPC Limited against payment overdue and later on renamed it to Feroze Gandhi Unchahar Thermal Power Plant by NTPC Limited.
The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar , India.
NTPC Kanti also known as George Fernandes Thermal Power Plant Station [1] is located in Kanti, Muzaffarpur, Bihar. [2] George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. [3] The share of the company is 100% of the NTPC.
The work of NTPC Super Thermal Power Plant in Kahalgaon started in 1985. [3] In March 1992, the first unit of 210 MW capacity was commissioned. Gradually, its capacity was increased. The total installed capacity of the plant is 2,340 MW.
It is the largest power company in India with an installed capacity of 76442.78 MW. [5] Although the company has approximately 16% of the total national capacity, it contributes to over 25% of total power generation due to its focus on operating its power plants at higher efficiency levels (approximately 80.2% against the national PLF rate of ...
The Vindhyachal Thermal Power Station is located in Singrauli district in the Indian state of Madhya Pradesh.One of the coal-fired power stations of NTPC, it is the largest power station in India, and the 10th largest coal-fired power station in the world, with an installed capacity of 4,760 MW with total of 4783 MW. [1]
The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Dipika Mines of South Eastern Coalfields Limited . The project has an installed capacity of 2980 MW consisting of two stages, stage one which got commissioned late was of 3 units of 660 MW each involving super-critical boilers technology ...
Vallur Thermal Power Station is a power plant located in Vallur, Thiruvallur district, India. The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each. [1]