Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.
A combined footing is typically utilized when the spacing of the columns is too restricted such that if isolated footing were used, they would overlap one another. Also, when property lines make isolated footings eccentrically loaded, combined footings are preferred. When the load among the columns is equal, the combined footing may be rectangular.
The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.
Most of the piers of modern bridges are made of reinforced concrete or prestressed concrete for larger structures. Two types of forms are mainly encountered: columns or walls. Each support can be composed of one or more walls or columns. The standard-shaped walls that can be found on most highways are represented in the illustration opposite.
Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1] This differs from precast concrete technology where slabs are cast elsewhere and then brought to the construction site and assembled. [ 2 ]
Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...
Shallow foundations of a house versus the deep foundations of a skyscraper. Foundation with pipe fixtures coming through the sleeves. In engineering, a foundation is the element of a structure which connects it to the ground or more rarely, water (as with floating structures), transferring loads from the structure to the ground.
The tremie concrete placement method uses a vertical or nearly vertical pipe, through which concrete is placed by gravity feed below water level. [4]The lower end of the pipe is kept immersed in fresh concrete so that concrete rising from the bottom displaces the water above it, thus limiting washing out of the cement content of the fresh concrete at the exposed upper surface.