A cantilever is a rigid structural element that extends horizontally and is unsupported at one end. Typically it extends from a flat vertical surface such as a wall, to which it must be firmly attached. Like other structural elements, a cantilever can be formed as a beam, plate, truss, or slab.
Rebar detailing is the discipline of preparing 'shop/placing' or 'fabrication' drawings or shop drawings of steel reinforcement for construction. Engineers prepare 'design drawings' that develop required strengths by applying rebar size, spacing, location, and lap of steel .
The reinforcement in a RC structure, such as a steel bar, has to undergo the same strain or deformation as the surrounding concrete in order to prevent discontinuity, slip or separation of the two materials under load. Maintaining composite action requires transfer of load between the concrete and steel.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
Diagram of double tee beam. A double tee or double-T beam is a load-bearing structure that resembles two T-beams connected to each other side by side. The strong bond of the flange (horizontal section) and the two webs (vertical members, also known as stems) creates a structure that is capable of withstanding high loads while having a long span.
This approach represents an improvement step for the durability design of reinforced concrete structures, it is suitable for the design of ordinary structures designed with traditional materials (Portland cement, carbon steel rebar) and with an expected service life of 50 years. Nevertheless, it is considered not completely exhaustive in some ...
The rebar cages can also be installed inside printed concrete formworks in non-structural members, and the holes are filled with grout. This method of post-installed reinforcement has proven to be cost-effective; however, it requires attention to the interface between steel and the printed concrete. [12]
The effective reinforcement ratio was determined from the maximum arching moment of resistance in a rigidly restrained concrete slab, which Rankin [21] had derived for laterally restrained concrete slabs from McDowell, McKee and Sevin's [22] arching action deformation theory for masonry walls.