Search results
Results from the WOW.Com Content Network
The BTS Skytrain Map of Bangkok urban transit systems. Bangkok Metropolitan Region is served by 9 rapid transit rail lines as of 2023. The BTS Skytrain consists of three lines, the Sukhumvit Line, Silom Line and Gold Line. The Metropolitan Rapid Transit (MRT) also consists of three lines, the Blue Line, Purple Line and Yellow Line.
The 28.6-kilometer (17.8 mi)-long Airport Rail Link opened for service on 23 August 2010. [2] In the future, Airport Rail Link will extend from Phaya Thai towards Krung Thep Aphiwat Central Terminal and Don Mueang International Airport. Its rail will also be used for the proposed Don Mueang–Suvarnabhumi–U-Tapao high-speed railway.
Besides the three BTS lines, Bangkok's rapid transit system includes the underground and elevated Mass Rapid Transit (MRT) lines, the Bus Rapid Transit System (BRT), and the elevated Airport Rail Link (ARL), serving several stations before reaching Suvarnabhumi Airport, and the SRT Red Lines of the State Railway of Thailand.
Airport rail link; Airport Rail Link: Don Mueang–Suvarnabhumi–U-Tapao high-speed railway (Phaya Thai to Don Mueang section) TBA: Phaya Thai: Don Mueang: 20.31 km (12.62 mi) 2 Approved State Railway of Thailand: Rapid Transit; Sukhumvit Line: Lam Luk Ka Extension TBA: Khu Khot: Eastern Ring Road Lam Luk Ka 7.8 km (4.8 mi) 4 Postponed
The following lists the stations of all urban rail transit systems in Bangkok and the surrounding Bangkok Metropolitan Region, including the BTS, MRT, Airport Rail Link and SRT Red Lines. It does not include the 12 stations of the Bangkok BRT. The table below lists 192 stations in operation, comprising: 47 stations on the BTS Sukhumvit Line
The line links 6 other lines; the MRT Blue Line, interchange with the MRT Orange Line (which is under construction), the planned MRT Grey Line and MRT Brown Line, the Airport Rail Link (Bangkok) and finally the BTS Sukhumvit Line. As such, it is an important cross city link in the middle north-eastern and eastern areas of Bangkok.
In September 2018, it was announced that compatibility with the Airport Rail Link would be delayed until the end of 2018, and BMTA buses would be delayed until March 2019. [7] However, as of May 2023, no new Mangmoom Card had been issued, and the one issued by Bangkok MRT is now the MRT card.
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Donate