Pipe bursting is a trenchless method of replacing buried pipelines (such as sewer, water, or natural gas pipes) without the need for a traditional construction trench. "Launching and receiving pits" replace the trench needed by conventional pipe-laying.
It is a jointless, seamless pipe lining within an existing pipe. As one of the most widely used rehabilitation methods, CIPP has applications in sewer, water, gas, chemical and district heating pipelines ranging in diameter from 0.1 to 2.8 meters (2–110 inches).
Pipe replacement by pipe bursting. Trenchless rehabilitation includes such construction methods as spiral wound lining, sliplining, thermoformed pipe, pipe bursting, shotcrete, gunite, cured-in-place pipe (CIPP), grout-in-place pipe, mechanical spot repair, and other methods for the repair, rehabilitation, or replacement of existing buried pipes and structures without excavation, or at least ...
A slip coupling (sometimes also called a repair coupling) is deliberately made without this internal stop to allow it to be slipped into place in tight locations, such as the repair of a pipe that has a small leak due to corrosion or freeze bursting, or which had to be cut temporarily for some reason. Since the alignment stop is missing, it is ...
Pipe ramming (sometimes also called pipe jacking) is a trenchless method for installation of steel pipes and casings. Distances of 30 m (150 feet) or more and over 500 mm (20 inches) in diameter are common, although the method can be used for much longer and larger installations.
Michels Pipeline, Inc. is a full-service mainline pipeline, facilities, and maintenance and repair contractor. Services include pipe fabrication; oil, gas, and water pipeline installation; compressor and pumping station construction; and integrity, maintenance, and emergency repairs.
For premium support please call: 800-290-4726 more ways to reach us
The pipe in the tunnel has an inside diameter of 22 feet (6.7 m). [3] The East Side tunnel was the largest sewer construction project ever undertaken by the City of Portland. A contractor, Kiewit-Bilfinger Berger (KBB), used a tunnel boring machine that was 300 feet (91 m) long and had a cutting head that was 25 feet (7.6 m) in diameter. In ...