Ad
related to: how to calculate built up space between walls of basement paint- Speciality Paint
Shop featured specialty products.
Premium Specialty Paint Selection.
- Color Trends 2025 Totes
Introducing Cinnamon Slate 2113-40
Color of the Year 2025
- Exterior Paint
High-Quality Exterior Paints.
Shop Premium Exterior Paint.
- Primers
Primers for Stunning Results.
High-Performance Primer.
- Speciality Paint
Search results
Results from the WOW.Com Content Network
Waterproofing and drainage considerations are especially important in cases where ground water is likely to build up in the soil or where there is a high water table. Water in the soil causes hydrostatic pressure to be exerted underneath basement floors and walls. This hydrostatic pressure can force water in through cracks, which can cause ...
Floor Area ratio is sometimes called floor space ratio (FSR), floor space index (FSI), site ratio or plot ratio. The difference between FAR and FSI is that the first is a ratio, while the latter is an index. Index numbers are values expressed as a percentage of a single base figure. Thus an FAR of 1.5 is translated as an FSI of 150%.
In architecture, construction, and real estate, floor area, floor space, or floorspace is the area (measured in square metres or square feet) taken up by a building or part of it. The ways of defining "floor area" depend on what factors of the building should or should not be included, such as external walls, internal walls, corridors, lift ...
Partial height wall, a low wall that doesn't extend all the way up to the ceiling. Thin solid lines are used for built-in structures (such as cabinets , bookshelves, or plumbing fixtures). Thin dotted lines indicate overhead features, such as wall cabinets in a kitchen or a special ceiling treatment or an archway in the living room.
Masonry walls are built with a damp-proof course to prevent rising damp, and the concrete in foundations needs to be damp-proofed or waterproofed with a liquid coating, basement waterproofing membrane (even under the concrete slab floor where polyethylene sheeting is commonly used), or an additive to the concrete.
A DPC layer is usually laid below all masonry walls, regardless if the wall is a load bearing wall or a partition wall. A damp-proof membrane (DPM) is a membrane material applied to prevent moisture transmission. A common example is polyethylene sheeting laid under a concrete slab to prevent the concrete from gaining moisture through capillary ...
In many cases, damp is caused by "bridging" of a damp-proof course that is otherwise working effectively. For example, a flower bed next to an affected wall might result in soil being piled up against the wall above the level of the DPC. In this example, moisture from the ground would be able to ingress through the wall from the soil.
An underground crawl space (as the name implies) is a type of basement in which one cannot stand up—the height may be as little as one foot (30 cm), and the surface is often soil. Crawl spaces offer a convenient access to pipes, substructures and a variety of other areas that may be difficult or expensive to access otherwise.
Ad
related to: how to calculate built up space between walls of basement paint