enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Dowel bar retrofit - Wikipedia

    en.wikipedia.org/wiki/Dowel_bar_retrofit

    The dowels need to be smooth, round, epoxy and made of bond breaker coated steel conforming to requirements. The bond breaker is to be applied on all surfaces of the dowel bar. The expansion caps belong at each end of the dowel bar and the dowel bar support chairs are used to firmly hold the dowels centered in the slots during backfill operations.

  3. Marcus' method - Wikipedia

    en.wikipedia.org/wiki/Marcus'_method

    Marcus's method is a structural analysis used in the design of reinforced concrete slabs.The method was developed by Henri Marcus and described in 1938 in Die Theorie elastischer Gewebe und ihre Anwendung auf die Berechnung biegsamer Platten. [1]

  4. First fix and second fix - Wikipedia

    en.wikipedia.org/wiki/First_fix_and_second_fix

    First fix and second fix are terms used in the UK and Irish housebuilding and commercial building construction industry.. First fix comprises all the work needed to take a building from foundation to putting plaster on the internal walls.

  5. Dowel - Wikipedia

    en.wikipedia.org/wiki/Dowel

    A dowel plate. The traditional tool for making dowels is a dowel plate, an iron (or better, hardened tool steel) plate with a hole having the size of the desired dowel.To make a dowel, a piece of wood is split or whittled to a size slightly bigger than desired and then driven through the hole in the dowel plate.

  6. Seismic retrofit - Wikipedia

    en.wikipedia.org/wiki/Seismic_retrofit

    Seismic retrofitting is the modification of existing structures to make them more resistant to seismic activity, ground motion, or soil failure due to earthquakes.With better understanding of seismic demand on structures and with recent experiences with large earthquakes near urban centers, the need of seismic retrofitting is well acknowledged.

  7. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    Formwork tables in use at a building site with more complicated structural features. Crane fork or elevator handled: By this approach the tables are limited in size and weight. Typical widths are between 6 and 10 feet (1.8 and 3.0 m), typical lengths are between 12 and 20 feet (3.7 and 6.1 m), though table sizes may vary in size and form.

  8. Dowelmax - Wikipedia

    en.wikipedia.org/wiki/Dowelmax

    The Dowelmax Jig with distance gauge bar. The Dowelmax is a loose tenon dowelling jig manufactured by the O.M.S. Tool company in Canada.The manufacturer claims that the small manufacturing tolerances of 0.026 millimetres (0.0010 in) for the aluminium, brass and steel components of the jig ensure accuracy and repeatability.

  9. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    For a suspended slab, there are a number of designs to improve the strength-to-weight ratio. In all cases the top surface remains flat, and the underside is modulated: A corrugated slab is designed when the concrete is poured into a corrugated steel tray, more commonly called decking. This steel tray improves strength of the slab, and prevents ...

  1. Related searches dowel new slab to existing ceiling calculator table for word format excel

    how to do a doweldowel shapes