The A6 motorway (Romanian: Autostrada A6) is a partially built motorway in Romania, planned to connect Bucharest with the Banat region, through the southern part of the country. [1]
The A7 motorway (Romanian: Autostrada A7), [1] also known as the Ploiești–Siret Motorway (Romanian: Autostrada Ploiești–Siret) or the Moldavia Motorway (Romanian: Autostrada Moldovei), [2] is a partially built motorway in Romania, that upon completion will link Ploiești to the north-eastern part of the country, partly along the Pan-European Corridor IX.
This section of the motorway is fully operational and is composed of two segments: Bucharest – Pitești and Pitești bypass. The Bucharest – Pitești segment (95.9 km) is the first motorway class road built in Romania and remained the only one for more than 15 years, until the completion of the Fetești – Cernavodă segment on the A2 motorway in 1987.
An additional 8.7 km segment, between Cluj-Napoca West and Nădășelu, was tendered in August 2012, [56] and awarded to the joint venture between Spedition UMB and Tehnostrade in April 2013. [57] Works on this segment were scheduled to begin as late as six months after signing the contract and take one year and a half to complete. [ 58 ]
A tender for a segment of 17.5 km (15.5 km of the South section and 2.5 km of the North section), called lot 3, between the A1 motorway and the DN6 road was launched in July 2017 and awarded in April 2018, to the joint-venture Spedition UMB–Tehnostrade–Artera Proiect, with one year allowed for the design of the motorway and two and a half ...
STB operates a complex system of trams measuring 332.2 km (206.4 mi) of routes [4] on 143.9 km (89.4 mi) of lines throughout Bucharest. [7] In addition to 23 tram lines, there are two converted light rail lines called metrou uşor ("light metro"), numbered 41 and 32, which serve the western and south-western parts of Bucharest.
It is divided into two major sections, the northern section and the southern section. The northern section has been widened to four lanes in 2010, [2] between the Chitila and the Voluntari junctions, [3] and a cable-stayed bridge was opened along the ring road in April 2011, in the Otopeni area, which overpasses the railway ring [4] (built by a joint-venture of the Spanish company FCC and the ...
The A8 motorway (Romanian: Autostrada A8), also known as The Union Motorway (Romanian: Autostrada Unirii [2]) or the East-West Motorway (Romanian: Autostrada Est-Vest [3]) is a planned motorway in Romania, that will cross the Eastern Carpathians to connect the historical regions of Moldavia and Transylvania.