Ad
related to: calculate standstill period for concrete floor plan construction
Search results
Results from the WOW.Com Content Network
A hold-down may also refer to clamping device used to anchor a pipe to a structural steel element or concrete floor or allow movement of the pipe in an axial direction. [1] At the bottom, the hold down is connected to the concrete foundation or structural slab by an embedded or epoxied anchor bolt. At the top, the hold down is connected to a ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
First the supports are built, then the pods are arranged in place, and finally the concrete is poured. This process may occur in three different approaches, however the basic method is the same in each: In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4]
The precast concrete slab has tubular voids extending the full length of the slab, typically with a diameter equal to the 2/3–3/4 the thickness of the slab. This makes the slab much lighter than a massive solid concrete floor slab of equal thickness or strength. The reduced weight also lowers material and transportation costs.
Beam and block is a construction method to support flooring, especially for ground floors as well as multi story buildings. [1] It is made of cast concrete, one piece of which is a prestressed concrete beam, which can be an inverted T-shaped beam, or lintel, the other piece being a simple rectangular block. [1]
The Filigree Wideslab method is a process for construction of concrete floor decks from two interconnected concrete placements, one precast in a factory, and the other done in the field. The method was developed during the late 1960s by Harry H. Wise as a more efficient and economic construction process than conventional cast-in-place ...
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
The initiation time is related to the rate at which carbonation propagates in the concrete cover thickness.Once that carbonation reaches the steel surface, altering the local pH value of the environment, the protective thin film of oxides on the steel surface becomes instable, and corrosion initiates involving an extended portion of the steel surface.
Ad
related to: calculate standstill period for concrete floor plan construction